Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07757
Well Classification: GW Status: PA - 11/22/2016
Well Name/No:NILES S MILLER UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/22/2016
FacilityID:239969LocationID:317787
County:WELD #123Location:SWSW 28 3N66W 6
Field:WATTENBERG - #90750Elevation:4945 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  990 FWLLat/Long: 40.191407 / -104.787880Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.191370 / -104.788010Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 11/22/2016             Measured TD: 8030 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 11/22/2016
Wellbore Permit
Permit #:19730462 Expiration Date:9/18/1997
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: W2SW

Wellbore Completed
Completion Date:11/5/1973
Spud Date:8/9/1973Spud Date Is:ACTUAL
Measured TD:8030 ft.Measured PB depth:7967 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES, FDC-GR-CALIPER
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 630 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 630 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8030 ft., Weight: 10.5/11.6, Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7240 ft., Bottom: 8030 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8030 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 6633 ft., Bottom: 7240 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
J SAND7854 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/22/2016                Interval Top: 7857 ft.    Interval Bottom: 7914 ft.

 Completed Information for Formation J SAND
1st Production Date:10/30/1973Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/2/2010
Treatment Summary:SET CIBP @ 7535 W/ 2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY.
Formation Treatment
Treatment Date:11/5/1973
Treatment Summary:7857-7919' 183,330 GALS; 201,600# 100 MESH SAND; 50,400# 20/40 SAND; 16,300# 10/20 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 54
CALC_GOR 25814
CALC_MCF_GAS 1394
MCF_GAS 1394
Perforation Data:
Interval Top:7857 ft.# Of Holes:80
Interval Bottom:7914 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/12/1998                 Interval Top: 7173 ft.    Interval Bottom: 7919 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/23/1997Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/1973
Treatment Summary:COMMINGLED
Tubing Size:2.375 in.Tubing Setting Depth:7866 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/23/1997Test Method:FLOWING
Hours Tested:48Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 2
CALC_GOR 10000
MCF_GAS 20
Perforation Data:
Interval Top:7173 ft.# Of Holes:256
Interval Bottom:7919 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/22/2016                Interval Top: 7173 ft.    Interval Bottom: 7425 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/16/1997Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/8/2010
Treatment Summary:NBRR PERF 7173-7286 HOLES 116 SIZE 0.38. CODL PERF 7410-7425 HOLES 60 SIZE 0.38. REFRAC NBRR W/ 500 GAL 15% HCL AND 172561 GAL VISTAR HYBRID AND 250060# 20/40 SAND AND 4040# SB EXCEL. REFRAC CODL W/ 117247 GAL VISTAR AND 261300# 20/40 SAND AND 4100# SB EXCEL.
Formation Treatment
Treatment Date:11/5/1973
Treatment Summary:NB-CD FRAC: PUMPED 643 BBLS POLYMER GEL & 1,963 BBLS OF GEL W/400,000# 20/40 SAND. FLUSHED W/43 BBLS OF 2% KCL. MAX PSI: 6,450 PSI MAX RATE: 25.4 BPM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/26/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 50
BBLS_OIL 48
BTU_GAS 1223
CALC_BBLS_H2O 50
CALC_BBLS_OIL 30
CALC_GOR 1933
CALC_MCF_GAS 58
CASING_PRESS 1350
GRAVITY_OIL 50
MCF_GAS 208
Perforation Data:
Interval Top:7173 ft.# Of Holes:176
Interval Bottom:7425 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/22/2016
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No