|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/22/2016 Measured TD: 8030 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/22/2016 | | Wellbore Permit | | | Permit #: | 19730462 | Expiration Date: | 9/18/1997 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: W2SW |
| | |
| Wellbore Completed | | Completion Date: | 11/5/1973 | | Spud Date: | 8/9/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 8030 ft. | Measured PB depth: | 7967 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR-CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 630 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 630 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8030 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7240 ft., Bottom: 8030 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8030 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 6633 ft., Bottom: 7240 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 7854 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/22/2016 Interval Top: 7857 ft. Interval Bottom: 7914 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/30/1973 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2010 | | Treatment Summary: | SET CIBP @ 7535 W/ 2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. | | Formation Treatment | | Treatment Date: | 11/5/1973 | | Treatment Summary: | 7857-7919' 183,330 GALS; 201,600# 100 MESH SAND; 50,400# 20/40 SAND; 16,300# 10/20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 54 | | CALC_GOR | 25814 | | CALC_MCF_GAS | 1394 | | MCF_GAS | 1394 |
| | Perforation Data: | | Interval Top: | 7857 ft. | # Of Holes: | 80 | | Interval Bottom: | 7914 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/12/1998 Interval Top: 7173 ft. Interval Bottom: 7919 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/23/1997 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/5/1973 | | Treatment Summary: | COMMINGLED |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7866 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/23/1997 | Test Method: | FLOWING | | Hours Tested: | 48 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 2 | | CALC_GOR | 10000 | | MCF_GAS | 20 |
| | Perforation Data: | | Interval Top: | 7173 ft. | # Of Holes: | 256 | | Interval Bottom: | 7919 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/22/2016 Interval Top: 7173 ft. Interval Bottom: 7425 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/16/1997 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/8/2010 | | Treatment Summary: | NBRR PERF 7173-7286 HOLES 116 SIZE 0.38. CODL PERF 7410-7425 HOLES 60 SIZE 0.38. REFRAC NBRR W/ 500 GAL 15% HCL AND 172561 GAL VISTAR HYBRID AND 250060# 20/40 SAND AND 4040# SB EXCEL. REFRAC CODL W/ 117247 GAL VISTAR AND 261300# 20/40 SAND AND 4100# SB EXCEL. | | Formation Treatment | | Treatment Date: | 11/5/1973 | | Treatment Summary: | NB-CD FRAC: PUMPED 643 BBLS POLYMER GEL & 1,963 BBLS OF GEL W/400,000# 20/40 SAND. FLUSHED W/43 BBLS OF 2% KCL. MAX PSI: 6,450 PSI MAX RATE: 25.4 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/26/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 50 | | BBLS_OIL | 48 | | BTU_GAS | 1223 | | CALC_BBLS_H2O | 50 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 1933 | | CALC_MCF_GAS | 58 | | CASING_PRESS | 1350 | | GRAVITY_OIL | 50 | | MCF_GAS | 208 |
| | Perforation Data: | | Interval Top: | 7173 ft. | # Of Holes: | 176 | | Interval Bottom: | 7425 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/22/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|