COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02)
403038519
09/29/2022
Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017).
EngineerForm: (02)
403038519
11/02/2022
1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice. 2)Operator shall provide cement coverage from the production casing shoe (4+1/2" SECOND STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with cement bond log.
EngineerForm: (04)
404018955
01/06/2025
1) Provide electronic Form 42 Notice of Remedial Cementing Operations 2) The placed cement shall be verified with a CBL and documented with a Form 5 within 30 days of repair operations. 3) After any remedial cementing operations, Operator will successfully pressure test the production casing for a minimum of 30 minutes and to a minimum of 500 psi greater than the maximum surface pressure anticipated to be imposed during stimulation. Pressure test to be submitted on Form 21 within 30 days of the pressure test.
EngineerForm: (04)
404139369
04/22/2025
1) Provide electronic Form 42 Notice of Remedial Cementing Operations 2) The placed cement shall be verified with a CBL. 3) After any remedial cementing operations, Operator will successfully pressure test the production casing for a minimum of 30 minutes and to a minimum of 500 psi greater than the maximum surface pressure anticipated to be imposed during stimulation. Pressure test to be submitted on Form 21 within 30 days of the pressure test. 4) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure. 5) Submit a Form 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
EngineerForm: (04)
404139369
04/22/2025
Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test: 1) Prior to stimulation. If any pressure greater than threshold pressure is observed or if there is evidence of communication, Operator must contact ECMC engineering for approval prior to stimulation. 2) Within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
403038519
11/9/2022
Alternative Logging Program: One of the first wells drilled on this pad will be logged with an open-hole resistivity log with gamma-ray, from TD into the surface casing. All wells on the pad will have a cement bond log (CBL) with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs will state “Alternative Logging Program - No open-hole logs were run” and will clearly identify the type of log and the well (by API#) in which open-hole logs were run.