Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-12600
Well Classification: OW Status: PR - 9/22/2025
Well Name/No:FEDERAL #RG 334-11-298
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC060740
Facility Status:PRStatus Date9/22/2025
FacilityID:483246LocationID:482958
County:RIO BLANCO #103Location:Lot 4 13 2S98W 6
Field:SULPHUR CREEK - #80090Elevation:6618 ft.
Basin:PICEANCE BASIN  
Planned Location:1057FNL  897 FWLLat/Long: 39.882274 / -108.346534Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.882272 / -108.346534Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/30/2025
End Date: 8/8/2025
Reported: 9/24/2025
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/22/2025             Measured TD: 11010 ft.    Vertical TD: 10321 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/22/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/6/2025
Proposed Top PZ Location:Sec:11 Twp: 2S 98W Footage: 696 FSL  1972 FEL
Bottom Hole Location:Sec:11 Twp: 2S 98W Footage: 696 FSL  1972 FEL
Proposed Depth/Form:12393 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1369 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 447, Top: 0 ft., Bottom: 1369 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3302 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 163, Top: 2236 ft., Bottom: 3302 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12393 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 993, Top: 6849 ft., Bottom: 12393 ft.

Wellbore Completed
Completion Date:11/1/2024
Spud Date:8/7/2024Spud Date Is:ACTUAL
Measured TD:11010 ft.Measured PB depth:10974 ft.
True Vertical TD:10321 ft.True Vertical PB depth:10285 ft.
Top PZ Location:Sec:11 Twp: 2 98Footage: 774 FSL  1789 FEL
Bottom Hole Location:Sec:11 Twp: 2 98Footage: 845 FSL  1943 FEL
Log Types:CBL, (RES on 05-103-12596)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 82 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 194, Top: 0 ft., Bottom: 82 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1379 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 559, Top: 0 ft., Bottom: 1379 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3327 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 297, Top: 1398 ft., Bottom: 3327 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11010 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1, Top: 10985 ft., Bottom: 11010 ft., Determination Method: CBL
Additional Cement:String Type: 2ND , Top: 5480 ft., Depth: 10620 ft., Bottom: 10985 ft., Sacks: 1586, Method: RETAINER
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER902 ft.
WASATCH2774 ft.
WASATCH G5045 ft.
OHIO CREEK7018 ft.
WILLIAMS FORK7018 ft.
CAMEO10448 ft.
ROLLINS10904 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 9/22/2025                 Interval Top: 8415 ft.    Interval Bottom: 10811 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/22/2025Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/30/2025Treatment End Date:8/8/2025
Treatment Summary:171,073 bbls of Slickwater; 2038 gals ( 49 bbls) of Biocide; Williams Fork: 8415' - 10447' with 250 holes Cameo: 10448' - 10811' with 62 holes
Total fluid used in treatment (bbls):171122Max pressure during treatment (psi):6472
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):171073Total flowback volume recovered (bbls):80766
Fresh water used in treatment (bbls):49Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10671 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/22/2025Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1090
CALC_MCF_GAS 2810
CASING_PRESS 2500
MCF_GAS 2810
TUBING_PRESS 2370
Perforation Data:
Interval Top:8415 ft.# Of Holes:312
Interval Bottom:10811 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)1050
Total Gas Produced (MCF)128477
GOR122359
GOR DeterminationMCFE
Average BOE per Day63.705
Average MCFE per Day369.478

 Federal Financial Assurance  i 

 Tribal Well  i No