Drilling/Completion Operations | Form: (02 ) 400237411 1/29/2012 | CLOSED LOOP SYSTEM WILL BE IMPLEMENTED DURING DRILLING, WATER BASED MUD |
Storm Water/Erosion Control | Form: (02 ) 400237411 1/29/2012 | TOP SOIL WILL BE SALVAGED AND STORED WHERE NO VEHICLE TRAFFIC WILL CROSS THE MOUND. |
Site Specific | Form: (02 ) 400237411 1/29/2012 | THISWELL SITE WAS SELECTED TO UTILIZE ONE LOCATION FOR 2 WELLS, THIS LOCATION IS ON EXISTING LEASE ROAD. |
Construction | Form: (02 ) 400237411 1/29/2012 | CUTTINGS PIT WILL BE CONSTRUCTED TO BLM GOLD BOOK STANDARDS, NO PORTION OF THE PIT WILL BE CONSTURCTED IN ANY FILL MATERIAL. |