Engineer | Form: (04 ) 401454421 11/14/2017 | Contact COGCC engineering staff for approval of repair procedure if a casing leak is discovered. |
UIC | Form: (04 ) 401454421 11/15/2017 | Well must pass a MIT prior to being returned to injection. MIT must be witnessed by COGCC staff. |
Engineer | Form: (04 ) 401522771 2/7/2018 | This approval is good for one year and a new application must be made before January 23, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|