| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/9/2023 | Treatment End Date: | 9/9/2023 |
| Treatment Summary: | PUMPED 47.6 BBLS 15% HCL W/SOLVENT AND 57 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 104 | Max pressure during treatment (psi): | 1600 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 57 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/8/2022 | Treatment End Date: | 11/8/2022 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL with additives, inhibitor, mutual solvent and 50 bbls fresh water. |
| Total fluid used in treatment (bbls): | 97 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 11/27/2017 | Treatment End Date: | 12/27/2017 |
| Treatment Summary: | WELLWORK COMPLETED TO CLEAN OUT WELLBORE, SQUEEZE CASING LEAK, ACID STIMULATION WITH 2000 GALLONS 15% HCL WITH 80 BBLS WATER, AND RUN NEW TUBING AND PACKER.
WELL WILL BE RETURNED TO INJECTION AFTER FORM 21 APPROVAL |
| Total fluid used in treatment (bbls): | 128 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 5/4/2017 | Treatment End Date: | N/A |
| Treatment Summary: | SET TUBING PLUG AT 5899' ON 10/27/1999 |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |