Engineer | Form: (04 ) 403046276 5/12/2022 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes submit an updated WBD.
2) If wellbore geometry changes or cement work is executed, submit information on a Form 5
3) Complete a Form 21 MIT to verify repairs for injection wells |
Engineer | Form: (04 ) 403239405 11/28/2022 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well or a Form 5 noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes submit an updated WBD.
2) Complete a Form 21 MIT to verify repairs for injection wells |
OGLA | Form: (04 ) 403239405 11/28/2022 | Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well repair/maintenance with a workover rig, wireline rig, or other heavy equipment do not constitute a nuisance or hazard to public health, welfare and the environment. |