Engineer | Form: (04 ) 402825943 10/6/2021 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results
2) If wellbore geometry changes or cement work is executed, submit information on a Form 5
3) If a casing leak is identified, contact area engineer with repair plans
4) Submit all logs completed on Report of Work Done Sundry or Form 5
5) Complete a Form 21 MIT to verify repairs for injection wells
|