Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06306
Well Classification: ERIW Status: IJ - 2/1/2022
Well Name/No:WEYRAUCH #2-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date2/1/2022
FacilityID:229218LocationID:314665
County:RIO BLANCO #103Location:NWNE 36 2N102W 6
Field:RANGELY - #72370Elevation:5326 ft.
Planned Location:647FNL  1979 FELLat/Long: 40.105036 / -108.789103Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.105110 / -108.789160Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 2/1/2022             Measured TD: 6486 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 2/1/2022
Wellbore Permit
Permit #:110001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-053062
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:3/20/1984
Measured TD:6486 ft.Measured PB depth:6486 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 18 ft., Weight: 60.3 , Citings Type: ACTUAL
Cement:Sacks: 59, Top: 0 ft., Bottom: 18 ft., Determination Method:
Casing:String Type: SURF, Hole Size: , Size: 9.625 in., Top: 0 ft., Depth: 516 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 516 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6075 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: , Bottom: 6073 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: 0 in., Size: 5.5 in., Top: 0 ft., Depth: 6038 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 6038 ft., Determination Method: Calc
Casing:String Type: OPEN HOLE, Hole Size: , Size: 6.125 in., Top: 6075 ft., Depth: 6486 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 2/1/2022                  Interval Top: 6075 ft.    Interval Bottom: 6486 ft.

 Completed Information for Formation WEBER
1st Production Date:12/31/1958Choke Size: 
Formation Name:WEBERCommingled:
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:2/3/2022Treatment End Date:N/A
Treatment Summary:HIGH CASING PRESSURE THIS INJECTION WELL WAS SHUT IN 7/22/2021 FOR HIGH CASING PRESSURE WHILE ON INJECTION. The workover consisted of pulling the injection tubing, and both the top & bottom packers, perform clean out, ran injection string and packers replacing upper packer, and adding a TM-40 spool & hanger. Well to be returned to injection pending an approved Form 21.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/22/2021Treatment End Date:7/22/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 90 BBLS WATER
Total fluid used in treatment (bbls):185Max pressure during treatment (psi):1975
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):90Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:12/7/2017Treatment End Date:N/A
Treatment Summary:FIRST INJECTION 12/1/1958 COA from doc#401276926 "update scout card, open hole,PBTD, tbg size, depth and date PBTD 6486'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6007 ft.
Tubing Packer Depth:5894 ft.Tubing Multiple Packer:Y ft.
Open Hole Top:6074 ft.Open Hole Bottom:6486 ft.
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6075 ft.# Of Holes:
Interval Bottom:6486 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No