Engineer | Form: (04 ) 401253591 4/10/2017 | 1) Submit CBL ran in 2008 referenced in procedure to COGCC on a sundry or with follow up repair documentation (Form 5 if cement is pumped).
2) Contact COGCC area engineer with depths of any casing leaks found for approval of repair plan. |
Engineer | Form: (04 ) 401192277 6/27/2018 | This approval is good for one year and a new application must be made before January 24, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (04 ) 402698790 6/3/2021 | 1) If a casing leak is identified, contact area engineer with cement squeeze plans.
2) Submit a Form 4 Sundry-Report of Work done including cement and operations summaries
3) Conduct Form 21 MIT to verify repairs |
Engineer | Form: (04 ) 403896137 8/28/2024 | 1) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
2) Complete a Form 21 MIT to verify repairs for injection wells
|