Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06233
Well Classification: ERIW Status: IJ - 5/26/2022
Well Name/No:FEE #39
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date5/26/2022
FacilityID:229149LocationID:314624
County:RIO BLANCO #103Location:SENE 29 2N102W 6
Field:RANGELY - #72370Elevation:5258 ft.
Planned Location:1980FNL  800 FELLat/Long: 40.115825 / -108.860565Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.115890 / -108.860660Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 5/26/2022             Measured TD: 6368 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 5/26/2022
Wellbore Permit
Permit #:100001 Expiration Date:1/1/1948
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:8/15/1947
Spud Date:6/17/1947Spud Date Is:ACTUAL
Measured TD:6368 ft.Measured PB depth:6332 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 45 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 54, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 732 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 732 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5688 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 0 ft., Bottom: 5688 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: , Size: 5.5 in., Top: 5542 ft., Depth: 6358 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 5542 ft., Bottom: 6358 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA1837 ft.
FRONTIER2738 ft.
DAKOTA3096 ft.
MORRISON3160 ft.
ENTRADA3973 ft.
WEBER5846 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 5/26/2022                 Interval Top: 5710 ft.    Interval Bottom: 6287 ft.

 Completed Information for Formation WEBER
1st Production Date:6/25/1979Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/24/2022Treatment End Date:5/24/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS WATER
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2460
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:9/7/2021Treatment End Date:N/A
Treatment Summary:Well was Shut in 03/09/2021 due to high casing pressure on injection. Wellwork was completed to pulling both packers, cleaning out to the top of fish, and replacing both packers and tubing. Well to be returned to active injection pending approved form 21. CORRECTION TO PERFORATIONS THERE WAS AN ERROR ON THE PREVIOUS REPORTING.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/13/2019Treatment End Date:9/13/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID, 80 BBLS OF WATER.
Total fluid used in treatment (bbls):127Max pressure during treatment (psi):2240
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/23/2017Treatment End Date:12/23/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 160 BBLS WATER. FIRST DATE OF INJECTION 5/1/1969
Total fluid used in treatment (bbls):255Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):160Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:5/17/2017Treatment End Date:N/A
Treatment Summary:WELLWORK PERFORMED TO REPLACE TUBING AND PACKER. RAN IN WITH 174 JTS NEW FIBER LINED TUBING. WELL WILL REMAIN SHUT IN UNTIL WITNESSED MIT. CORRECTION TO PERFORATION INTERVAL AND NUMBER OF PERFORATIONS REPORT 5/19/14. FIRST DATE OF INJECTION FOR THIS WELL 5/1/1969
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/16/2014Treatment End Date:5/16/2014
Treatment Summary:ACID STIMULATION
Total fluid used in treatment (bbls):168Max pressure during treatment (psi):2061
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):98Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):70Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Date:4/27/2012
Treatment Summary:PUMPED 3000 GALLONS 20% HCL DOWN COIL TUBING TO 5472' AT 0.5 BPM @ 2000 PSI.
Formation Treatment
Treatment Date:12/2/2008
Treatment Summary:ACIDIZE FORMATION WITH 5000 GALLONS HEATED 15% HCI, EOT @6034'
Tubing Size:2.875 in.Tubing Setting Depth:5678 ft.
Tubing Packer Depth:5479 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5710 ft.# Of Holes:408
Interval Bottom:6287 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)230629
GOR
GOR DeterminationMCFE
Average BOE per Day109.425
Average MCFE per Day634.640

 Federal Financial Assurance  i 

 Tribal Well  i No