COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
UICForm: (04 )
401886808
3/22/2019
Well must pass witnessed MIT prior to return to injection.
UICForm: (04 )
401886808
3/22/2019
File Form 5 if cement work is required to repair well. File Form 5A to update new tubing-packer configuration, report treatments if any, and any new perforations.
EngineerForm: (04 )
403656793
1/17/2024
1) For applicable operations , report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run 3) Complete a Form 21 MIT to verify repairs for injection wells 4) Rig up to complete repairs or plugging operations within 6 months of identifying integrity issue
 