| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/12/2025 | Treatment End Date: | 11/12/2025 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER,
|
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 7/29/2025 | Treatment End Date: | N/A |
| Treatment Summary: | UIC Failure, isolated casing leak from 4749'-4782', est injection rate of 2 BPM @ 1550 psi. Set CICR @ 4523' and pump cement squeeze as follows: 35.5 sxs 13.4# premium G class down tubing, displace with 28 bbls Fresh Water, followed by 114.5 sxs 13.4# premium G class cement down tubing. Pressured up to 1530 psi and held solid. Drill out cement and chart tested casing - good test. RIH with injection equipment and RDMO. Return to injection pending an approved Form 21. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/22/2021 | Treatment End Date: | 7/22/2021 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 40 BBLS WATER
|
| Total fluid used in treatment (bbls): | 135 | Max pressure during treatment (psi): | 2160 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/1/2015 | Treatment End Date: | 7/1/2015 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AND 165 GALLONS SOLVENT AT 0.6 BPM |
| Total fluid used in treatment (bbls): | 195 | Max pressure during treatment (psi): | 2480 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 96 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 5/4/2010 |
| Treatment Summary: | ACID STIMULATION 5/4/2010 PUMPED 4000 GALLONS OF 20% HCL AND 124 GALLONS SCALE INHIBITOR & IRON STABILIZER THROUGH TUBING AT 6146'. |