UIC | Form: (04 ) 401318686 6/26/2017 | All repairs of the Union Pacific 7-29 must be completed or the well plugged and abandoned by December 3, 2017. Injection may not resume until the well is repaired and it passes an Mechanical Integrity Test witnessed by COGCC staff. |
UIC | Form: (04 ) 401427993 11/15/2017 | Contact COGCC UIC Lead (Koehler) if problems surface |
UIC | Form: (04 ) 401427993 11/15/2017 | Well must pass an MIT witnessed by COGCC staff prior to being returned to injection. |
Engineer | Form: (04 ) 403508763 8/28/2023 | 1) For applicable operations , report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
2) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run
3) Complete a Form 21 MIT to verify repairs for injection wells |