Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/20/2023 | Treatment End Date: | 4/20/2023 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH INHIBITOR AND 35 BBLS WATER |
Total fluid used in treatment (bbls): | 92 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/2/2021 | Treatment End Date: | 4/2/2021 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID AND 130 BBLS WATER |
Total fluid used in treatment (bbls): | 177 | Max pressure during treatment (psi): | 2100 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 130 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/24/2018 | Treatment End Date: | 3/24/2018 |
Treatment Summary: | PUMP 2000 GALLONS 15% HCL WITH 165 BBLS WATER. |
Total fluid used in treatment (bbls): | 212 | Max pressure during treatment (psi): | 2497 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 165 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 2/15/2010 |
Treatment Summary: | ACID STIMULATION 02/15/2010 PUMPES 4000 GALLONS OF 20% HCI, SPOT ACID FROM 5932-6323 AT A START PRESSURE OF 1400 PSI. |