COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
401227323
07/18/2017
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) Set at least 420’ of surface casing. 3) If production casing is set provide cement coverage to at least 200’ above the shallowest completed interval or Spergen, whichever is shallower and across Cheyenne/Dakota interval (5200’ to 4600’ min). Run and submit CBL to verify cemented intervals. 4) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Spergen, 40 sks cement across any DST w/ show, 40 sks cement 50’ below Cheyenne (5200’), 40 sks cement 50’ above top of Dakota (4600’), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
EngineerForm: (02)
401227323
07/18/2017
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) All: Within 60 days of rig release, prior to stimulation. 2) Delayed completion: 6 months after rig release, prior to stimulation. 3) All: Within 30 days of first production, as reported on Form 5A.
AgencyForm: (02)
401852443
12/27/2018
1) Provide 48 hour notice prior to spud vai electronic Form 42. 2) Set at least 440' of surface casing (5% of proposed TVD). Cement to surface. 3) If production casing is set provide cement coverage to at least 200' above the shallowest completed interval or Lansing, whichever is shallower and across Cheyenne/Dakota interval (5200' to 4600' min). Run and submit CBL to verify cemented intervals. 4) If well is a dry hole, set plugs at the following depths: 40 sks cement +/- 50' above the Spergen, 40 sks cement +/- above the Lansing, 40 sks cement across any DST w/ show, 40 sks cement 100' below Cheyenne (5200'), 40 sks cement 50' above top of Dakota (4600'), 50 sks cement from 50' below surface casing show up into surface casing. 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
AgencyForm: (02)
401852443
12/27/2018
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) All: Within 60 days of rig release, prior to stimulation. 2) Delayed completion: 6 months after rig release, prior to stimulation. 3) All: Within 30 days of first production, as reported on Form 5A.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
401227323
8/20/2017
Open hole resisitivity log with Gamma Ray log will be run from TD into the surface casing. A Cement Bond Log will be run on production casing, or on intermediate casing if a production liner is run. The Form 5, completion report, will list all logs run and have those logs attached.
General HousekeepingForm: (02 )
401852443
2/12/2019
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test: 1) All Within 60 days of rig release, prior to stimulation. 2) Delayed Completion: 6 months after rig release, prior to stimulation 3) All: Within 30 days of first production, as reported on Form 5A
Drilling/Completion OperationsForm: (02 )
401852443
2/12/2019
1) Provide 48 hour notice prior to spud via electrontic Form 42 2) Set at least 420' of surface casing 3) If production casing is set provide cement coverage to at least 200' above the shallowest completed interval or Spergen, whichever is shallower and across Cheyenne/Dakota interval ( 5200' to 4600" min). Rn and submit CBL to verify cemented inervals. 4) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50' avobe the Spergen, 40 sks cement across and DST w/ show, 40 sks cement 50' below Cheyenne (5200'), 40 sks cement 50' above top of Dakota ( 4600'), 50 sks cement from 50" below surface casing show up into surface casing, 15 sks cement in top of surface casing, cut 4ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
Drilling/Completion OperationsForm: (02 )
401852443
2/12/2019
Open hole resitivity log with Gamma Ray Log will be run From TD into the surace casing. A Cement Bond Log will be run on produciton casing, or on intermediate casing if a production liner is run. The Form 5, completion report, will list all logs run and have logs attached.