Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2025 Measured TD: 8521 ft. Vertical TD: 8454 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/11/2021 | | Proposed Top PZ Location: | Sec:5 Twp: 7S 54W | Footage: 2018 FSL 605 FWL | | Bottom Hole Location: | Sec:5 Twp: 7S 54W | Footage: 2018 FSL 605 FWL | | Proposed Depth/Form: | 8800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 440 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: , Bottom: 440 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 300 ft., Depth: 8800 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 602, Top: , Bottom: 8800 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/4/2019 | | Spud Date: | 4/17/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 8521 ft. | Measured PB depth: | 8484 ft. | | True Vertical TD: | 8454 ft. | True Vertical PB depth: | 8418 ft. | | Top PZ Location: | Sec:5 Twp: 7S 54W | Footage: 1990 FSL 668 FWL | | Bottom Hole Location: | Sec:5 Twp: 7S 54W | Footage: 2004 FSL 677 FWL | | Log Types: | GR, Triple Combo, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 445 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 445 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8485 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 715, Top: 3700 ft., Bottom: 8521 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3680 ft. | | | | | D SAND | 4680 ft. | | | | | J SAND | 4719 ft. | | | | | SKULL CREEK | 4892 ft. | | | | | DAKOTA | 4954 ft. | | | | | CHEYENNE | 5050 ft. | | | | | MORRISON | 5114 ft. | | | | | BLAINE | 5800 ft. | | | | | LYONS | 5853 ft. | | | | | STONE CORRAL | 6071 ft. | | | | | WOLFCAMP | 6300 ft. | | | | | LANSING-KANSAS CITY | 7063 ft. | | | | | MARMATON | 7416 ft. | | | | | CHEROKEE | 7600 ft. | | | | | ATOKA | 7811 ft. | | | | | MORROW | 8081 ft. | | | | | SPERGEN | 8331 ft. | | | | | SIMPSON | 8450 ft. | | | |
Formation SPGN Formation Classification: OW Status: SI - 7/1/2025 Interval Top: 8395 ft. Interval Bottom: 8405 ft.| Completed Information for Formation SPERGEN | | 1st Production Date: | 6/20/2019 | Choke Size: | | | Formation Name: | SPERGEN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/14/2019 | Treatment End Date: | N/A | | Treatment Summary: | Spergen formation was completed with lease crude oil as the completion fluid. There was no stimulation, no proppant or acid used. Formation was displaced with fresh water and oil from the field using another lease well. The casing string was filled with oil (approx. 160 to 180 barrels). Once the well produced 180 bbls was returned to the borrowed well. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7045 ft. | | Tubing Packer Depth: | 7045 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/14/2019 | Test Method: | Swab | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 73 | | CALC_BBLS_OIL | 219 | | GRAVITY_OIL | 36 |
| | Perforation Data: | | Interval Top: | 8395 ft. | # Of Holes: | 60 | | Interval Bottom: | 8405 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1051 |
| Total Gas Produced (MCF) | 239 |
| GOR | 227 |
| GOR Determination | BOE |
| Average BOE per Day | 2.982 |
| Average MCFE per Day | 17.316 |
| Federal Financial Assurance | i | |
|
|