WELL05-073-06528SILVERTON
16-10
POLARIS PRODUCTION OPCO LLC
10793
PR
10/1/2020
ARIKAREE CREEK
2914
LINCOLN  073
SESE 10 6S54W 6
432669View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400386245
04/22/2013
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) If production casing is set provide cement coverage to at least 200’ above the shallowest completed interval and cement Cheyenne/Dakota interval (5250’-4500’ minimum). Run and submit CBL to verify cemented intervals. 3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Spergen, 40 sks cement +/- 50’ above any DST w/ show, 40 sks cement at 5250’ up, 40 sks cement at 4500’ up, 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
EngineerForm: (04)
400719820
01/22/2015
1) The flaring of natural gas shall be conducted in accordance with COGCC Rule 912 for the initial production test period. 2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring. 3) If flaring will continue more than 6 months, submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. 4) The operator is required to obtain and maintain any required air permits from CDPHE. 5) The venting or flaring volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
EngineerForm: (04)
400982447
03/25/2016
1) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 2) Venting or flaring of natural gas shall comply with COGCC Rule 912. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) Notify the local emergency dispatch or the local governmental designee of natural gas flaring. 5) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons.
EngineerForm: (04)
401216621
04/26/2017
1) Venting or flaring of natural gas shall comply with COGCC Rule 912. 2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%).
EngineerForm: (04)
401543668
08/25/2020
1) Flaring of natural gas shall comply with COGCC Rule 912. 2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 3) Report metered flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE. 5) The expectation for permanent flares controlling separators will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. Operator shall manage this well so that production volumes do not exceed the combustor capacity. 6) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
EngineerForm: (04)
401543668
08/25/2020
For gas powered equipment, list that equipment and their per day fuel gas requirements in subsequent applications. Seasonal variations should be acknowledged. Provide last calibration date of gas meter onsite.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
400386245
4/27/2013
SEE ATTACHED