Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06528
Well Classification: OW Status: PR - 10/1/2020
Well Name/No:SILVERTON #16-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:POLARIS PRODUCTION OPCO LLC - 10793
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2020
FacilityID:432672LocationID:432669
County:LINCOLN #073Location:SESE 10 6S54W 6
Field:ARIKAREE CREEK - #2914Elevation:5227 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1183FSL  922 FELLat/Long: 39.539000 / -103.420070Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.539000 / -103.420070Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2020             Measured TD: 8450 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2020
Wellbore Permit
Permit #: Expiration Date:4/26/2015
Proposed Depth/Form:8700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: LGKC , Formation: LANSING-KANSAS CITY , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SPGN , Formation: SPERGEN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WRSW , Formation: WARSAW , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 197, Top: 0 ft., Bottom: 300 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8700 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 585, Top: 3619 ft., Bottom: 8700 ft.

Wellbore Completed
Completion Date:6/14/2013
Spud Date:5/24/2013Spud Date Is:ACTUAL
Measured TD:8450 ft.Measured PB depth:8325 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Caliper, Downlog.las, Induction, Laterolog, Mainpass.las, Microlog, Porosity, RepeatPass.las, Sonic, Triple Combo, Surface Cement Report, Production Cement Report and CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 336 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 90, Top: 0 ft., Bottom: 336 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 336 ft., Depth: 8432 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1117, Top: 2146 ft., Bottom: 8432 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA3659 ft.
DAKOTA4614 ft.
STONE CORRAL5998 ft.
WOLFCAMP6207 ft.6431 ft.
LANSING-KANSAS CITY6910 ft.
MARMATON7245 ft.7357 ft.
CHEROKEE7430 ft.7450 ft.
ATOKA7620 ft.7850 ft.
MORROW7865 ft.
MISSISSIPPIAN8026 ft.
SPERGEN8095 ft.
SIMPSON8160 ft.
ARBUCKLE8282 ft.8450 ft.

Formation SIMSN                   Formation Classification:  OW                   Status:  PR - 10/1/2020                 Interval Top: 8162 ft.    Interval Bottom: 8264 ft.

 Completed Information for Formation SIMPSON
1st Production Date:6/14/2015Choke Size: 
Formation Name:SIMPSONCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/9/2015Treatment End Date:6/12/2015
Treatment Summary:Acidized 8,162' -8,170' with 28.5 bbls of 15% HCL and displaced with 85 bbls of 2% KCL.
Total fluid used in treatment (bbls):113Max pressure during treatment (psi):0
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):28Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):85Total flowback volume recovered (bbls):167
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8152 ft.
Tubing Packer Depth:8152 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SIMSN.
Perforation Data:
Interval Top:8162 ft.# Of Holes:64
Interval Bottom:8264 ft.Hole Size:0.52 in.

Formation SPGN                     Formation Classification:  OW                     Status:  PR - 10/1/2020                 Interval Top: 8096 ft.    Interval Bottom: 8120 ft.

 Completed Information for Formation SPERGEN
1st Production Date:7/10/2013Choke Size: 
Formation Name:SPERGENCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/28/2013Treatment End Date:10/28/2013
Treatment Summary:3,000 gallons of 7.5% acetic acid with surfactant, Iron sequestering agent, acid inhibitor & scale inhibitor - No perfs added
Total fluid used in treatment (bbls):204Max pressure during treatment (psi):2260
Total gas used in treatment (mcf):0Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):26
Fresh water used in treatment (bbls):132Disposition method For flowback:DISPOSAL
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:6/10/2013Treatment End Date:N/A
Treatment Summary:No treatment was done on this formation.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 75
BBLS_OIL 131
BTU_GAS 550
CALC_BBLS_H2O 75
CALC_BBLS_OIL 131
CALC_GOR 114
CALC_MCF_GAS 15
GRAVITY_OIL 38
MCF_GAS 15
Perforation Data:
Interval Top:8096 ft.# Of Holes:0
Interval Bottom:8120 ft.Hole Size:0.52 in.

Formation CHRK                     Formation Classification:  OW                     Status:  PR - 10/1/2020                 Interval Top: 7442 ft.    Interval Bottom: 7445 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:12/1/2014Choke Size: 
Formation Name:CHEROKEECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/17/2014Treatment End Date:11/18/2014
Treatment Summary:Acidized with 12 bbls of 15% HCL and displaced with 61 bbls of water
Total fluid used in treatment (bbls):73Max pressure during treatment (psi):1710
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):45
Fresh water used in treatment (bbls):61Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CHRK.
Perforation Data:
Interval Top:7442 ft.# Of Holes:18
Interval Bottom:7445 ft.Hole Size:0.51 in.

Formation MS-PN                   Formation Classification:  OW                   Status:  CM - 6/24/2015                 Interval Top: 7404 ft.    Interval Bottom: 8142 ft.

 Completed Information for Formation MISSISSIPPIAN-PENNSYLVANI
1st Production Date:N/AChoke Size: 
Formation Name:MISSISSIPPIAN-PENNSYLVANICommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/14/2015Test Method:Pumping
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 348
BBLS_OIL 32
BTU_GAS 752
CALC_BBLS_H2O 348
CALC_BBLS_OIL 32
CALC_GOR 719
CALC_MCF_GAS 23
CASING_PRESS 35
GRAVITY_OIL 36
MCF_GAS 23
TUBING_PRESS 60
Perforation Data:
Interval Top:7404 ft.# Of Holes:142
Interval Bottom:8142 ft.Hole Size:0.51 in.

Formation MRTN                     Formation Classification:  OW                     Status:  PR - 10/1/2020                 Interval Top: 7274 ft.    Interval Bottom: 7408 ft.

 Completed Information for Formation MARMATON
1st Production Date:12/12/2014Choke Size: 
Formation Name:MARMATONCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/19/2014Treatment End Date:12/8/2014
Treatment Summary:Acidized with 38 bbls of 15% HCL with additives ... displaced with 106 bbls of 2% KCL - Perfs (7,404'-7,408') Perf's (7,274'-7,280') Acidized with 24 bbls of 15% HCL with additives and displaced with 74 bbls of 2% KCL water-
Total fluid used in treatment (bbls):242Max pressure during treatment (psi):1850
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):62Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):330
Fresh water used in treatment (bbls):180Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MRTN.
Perforation Data:
Interval Top:7274 ft.# Of Holes:60
Interval Bottom:7408 ft.Hole Size:0.51 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)2860
Total Gas Produced (MCF)336
GOR117
GOR DeterminationBOE
Average BOE per Day8.006
Average MCFE per Day46.406

 Federal Financial Assurance  i 

 Tribal Well  i No