| Agency | Form: (02) 2558082 07/07/2010 | 1) Provide 24 hour notice of MIRU to Craig Quint at 719-767-8939 or e-mail at craig.quint@state.co.us.
2) If production casing is set provide cement coverage to at least 200’ above shallowest completed interval (200’ above Cherokee at a minimum), and stage cement 100’ below to 50’ above Cheyenne/Dakota interval (4700’-4000’ minimum). Run and submit CBL to verify cemented intervals.
3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Cherokee, 40 sks cement across any DST w/ show, 40 sks cement 100’ below Cheyenne (4700’ up), 40 sks cement 50’ above top of Dakota (4000’ up), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole. |
| Engineer | Form: (02) 400661564 09/04/2014 | Added the stage cement line 4712', 180 sx, 4712'-2900' based on previous records (Form 5 and CBL). |
| Engineer | Form: (02) 403560364 10/26/2023 | Operator to submit a Form 5A to document work done. |