|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2021 Measured TD: 7890 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2021 | | Wellbore Permit | VERTICAL | | Permit #: | | Expiration Date: | 11/5/2026 | | Proposed Depth/Form: | 7890 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWN , Formation: PAWNEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWNA , Formation: PAWNEE A , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 332 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 332 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7882 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 5800 ft., Bottom: 7882 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4712 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 2900 ft., Bottom: 4712 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/11/2011 | | Spud Date: | 11/22/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7890 ft. | Measured PB depth: | 7890 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Dual Induction Guard Log Gamma Ray
Compensated Density Compensated Neutron Gamma Ray
Dual Spaced Cement Bond Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 332 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 332 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7882 ft., Weight: 17# , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 5800 ft., Bottom: 7882 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 2900 ft., Depth: 4712 ft., Bottom: 4212 ft., Sacks: 180, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3087 ft. | | N | N | | CODELL | 3629 ft. | | N | N | | DAKOTA | 4052 ft. | | N | N | | SHAWNEE | 5650 ft. | | N | N | | LANSING | 6595 ft. | | N | N | | MARMATON | 6928 ft. | | N | N | | PAWNEE | 6988 ft. | | N | Y | | CHEROKEE | 7057 ft. | | N | Y | | MORROW | 7570 ft. | | N | N | | SPERGEN | 7755 ft. | | N | N |
Formation STLS Formation Classification: Status: AB - 12/16/2010 Interval Top: 7790 ft. Interval Bottom: 7808 ft.| Completed Information for Formation ST LOUIS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | ST LOUIS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/16/2010 | | Treatment Summary: | Acid Job 1800 gal 15% MCA 45 bbls 2% KCL
Through Tubing |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7740 ft. | | Tubing Packer Depth: | 7740 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/16/2010 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 56 | | CALC_BBLS_H2O | 168 |
| | Perforation Data: | | Interval Top: | 7790 ft. | # Of Holes: | 72 | | Interval Bottom: | 7808 ft. | Hole Size: | 0.25 in. |
|
Formation KEYES Formation Classification: Status: AB - 12/21/2010 Interval Top: 7770 ft. Interval Bottom: 7780 ft.| Completed Information for Formation KEYES | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | KEYES | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/21/2010 | | Treatment Summary: | Acid Job 1000 gal 12 1/2% MCA 45 bbls 3% KCL
Through Tubing |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7724 ft. | | Tubing Packer Depth: | 7724 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/21/2010 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | DRY | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 48 | | CALC_BBLS_H2O | 144 |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 40 | | Interval Bottom: | 7780 ft. | Hole Size: | 0.25 in. |
|
Formation MRRW Formation Classification: Status: AB - 12/22/2010 Interval Top: 7720 ft. Interval Bottom: 7730 ft.| Completed Information for Formation MORROW | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MORROW | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2010 | | Treatment Summary: | Acid Job 1000 gal 12.5% MCA 46 bbls 4% KCL
Through Tubing |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7650 ft. | | Tubing Packer Depth: | 7650 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/22/2010 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | DRY | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 42 | | CALC_BBLS_H2O | 336 |
| | Perforation Data: | | Interval Top: | 7720 ft. | # Of Holes: | 40 | | Interval Bottom: | 7730 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OW Status: AB - 10/28/2014 Interval Top: 7056 ft. Interval Bottom: 7066 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | 1/2/2011 | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/9/2014 | Treatment End Date: | N/A | | Treatment Summary: | 9-9-2014 Set CIBP @7030' with 2 sks of cement, plugged and abandoned Cherokee Formation | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 12/23/2010 | | Treatment Summary: | Acid Job 1000 gal 15% MCA 42 bbls 2% KCL
Through Tubing |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 38 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 114 | | CALC_BBLS_OIL | 90 | | GRAVITY_OIL | 35 |
| | Perforation Data: | | Interval Top: | 7056 ft. | # Of Holes: | 40 | | Interval Bottom: | 7066 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNA Formation Classification: OW Status: PR - 6/1/2021 Interval Top: 6966 ft. Interval Bottom: 6978 ft.| Completed Information for Formation PAWNEE A | | 1st Production Date: | 9/15/2014 | Choke Size: | | | Formation Name: | PAWNEE A | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 9/9/2014 | Treatment End Date: | 9/10/2014 | | Treatment Summary: | 9-9-2014 Perf Pawnee A Formation 6966-6978', acid job 28 bbls 15% HCL, 41 bbls 2% KCL, SWAB | | Total fluid used in treatment (bbls): | 69 | Max pressure during treatment (psi): | 500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 28 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 231 | | Fresh water used in treatment (bbls): | 41 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6944 ft. | | Tubing Packer Depth: | 6944 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/9/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 45 | | BBLS_OIL | 18 | | CALC_BBLS_H2O | 135 | | CALC_BBLS_OIL | 54 | | GRAVITY_OIL | 36 |
| | Perforation Data: | | Interval Top: | 6966 ft. | # Of Holes: | 48 | | Interval Bottom: | 6978 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 815 |
| Total Gas Produced (MCF) | 555 |
| GOR | 680 |
| GOR Determination | BOE |
| Average BOE per Day | 2.501 |
| Average MCFE per Day | 14.486 |
| Federal Financial Assurance | i | |
|
|