| Engineer | Form: (04) 400977163 03/02/2016 | 1) Venting or flaring of natural gas shall comply with COGCC Rule 912.
2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice.
3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations.
4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%).
5) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
|
| Engineer | Form: (04) 401215675 04/26/2017 | 1) Venting or flaring of natural gas shall comply with COGCC Rule 912.
2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice.
3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations.
4) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons (typically enclosed device 98%).
|
| Engineer | Form: (04) 401522255 09/28/2018 | 1) Flaring of natural gas shall comply with COGCC Rule 912.
2) Metered flaring volumes must also be reported on the Operators Report of Monthly Operations, Form 7.
3) The operator is required to obtain and maintain any required air permits from CDPHE.
4) Operator will use combustion device with design destruction efficiency for hydrocarbons. Wells are to be managed so that production volumes do not exceed combustor capacity.
5) Provide the local emergency dispatch or the local governmental designee prior notice of natural gas flaring by supplying them with the approved Sundry Notice and all attachments. If any changes are made regarding this Sundry or the flaring protocol, local government designee and emergency dispatch are to be notified prior to flaring when flaring can be reasonably anticipated, or as soon as possible, but in no event more than two (2) hours after the flaring occurs.
6) This approval is good until October 1, 2019. A new application will be required to continue flaring be submitted.
|
| Engineer | Form: (04) 403252196 12/13/2022 | 1. Operator to provide the required documentation for work performed.
2. Operator to document and submit pressure test after work completed.
3. Pressure test to be completed by 06/13/2023. |