|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2024 Measured TD: 7653 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2024 | | Wellbore Permit | | | Permit #: | 20080385 | Expiration Date: | 3/13/2009 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8000 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 497, Top: 2500 ft., Bottom: 8000 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 9/9/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7653 ft. | Measured PB depth: | 7590 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | ALL CASED HOLE LOGS: THREE DETECTOR PNC, DIGITAL GAMMA RAY, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 371 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 371 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7632 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 6030 ft., Bottom: 7632 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3250 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 2950 ft., Bottom: 3250 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3797 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 126, Top: 3250 ft., Bottom: 4310 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 2950 ft., Depth: 3250 ft., Bottom: 3250 ft., Sacks: 75, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: 1156 ft., Bottom: 1450 ft., Sacks: 308, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 1809 ft., Depth: 1809 ft., Bottom: 1842 ft., Sacks: 40, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 2224 ft. | | N | N | | D SAND | 3267 ft. | | N | N | | MARMATON | 6284 ft. | | N | N | | CHEROKEE | 6536 ft. | | N | N | | ATOKA | 6780 ft. | | N | N | | MORROW | 7206 ft. | | N | N | | ST LOUIS | 7500 ft. | | N | N |
Formation ATOK Formation Classification: OW Status: SI - 6/1/2021 Interval Top: 6780 ft.| Completed Information for Formation ATOKA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | ATOKA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/13/2008 | | Treatment Summary: | 12/1/08 PERFORATE ATOKA FM 7104-7014 TOTAL 51 HOLES. 12/13/08 ACID FRAC ATOKA FM WITH 10000 GAL 15% HCL, 315 BBL SLICKWATER AND 212 BBL FLUSH FLUID. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1670 | | GRAVITY_OIL | 36 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | 0.04 in. |
|
Formation CHRK Formation Classification: OW Status: SI - 10/1/2024 Interval Top: 6538 ft. Interval Bottom: 6734 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | 3/19/2012 | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/15/2012 | | Treatment Summary: | ACIDIZE W/2000 GAL 15% MCA/HCL | | Formation Treatment | | Treatment Date: | 12/18/2008 | | Treatment Summary: | 12/16/08 PERFORATE CHEROKEE/TEBO FM 6664-6644 TOTAL 60 HOLES. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6684 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/20/2012 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 128 | | BBLS_OIL | 18 | | BTU_GAS | 1440 | | CALC_BBLS_H2O | 128 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 1111 | | CALC_MCF_GAS | 20 | | CASING_PRESS | 20 | | GRAVITY_OIL | 39 | | MCF_GAS | 20 | | TUBING_PRESS | 20 |
| | Perforation Data: | | Interval Top: | 6538 ft. | # Of Holes: | 48 | | Interval Bottom: | 6734 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 10/19/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|