WELL05-073-06317CRAIG
7-34
KTM OPERATING LLC
10722
AP
8/28/2024
BOLERO
7153
LINCOLN  073
SWNE 34 13S55W 6
309616View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
2285236
02/01/2012
1) Provide 24 hour notice of MIRU to Craig Quint at 719-767-8939 or e-mail at craig.quint@state.co.us. 2) Run CBL from 6600’ to 4000’ to confirm any cemented intervals. 3) 80 sack cement plug perf and squeeze @ at 450’ - Tag plug. Where is your 1” x 75 sx top up on the intermediate? Assumed it to be above 13 3/8” shoe. 15 sack cement plug at surface – Set plug 50’ to surface in 8 5/8” casing and 8 5/8” x 13” annulus.
EngineerForm: (04)
401617131
07/10/2018
This approval is good for one year and a new application must be made before December 04, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
403191994
10/10/2022
As per rule 434, this well is designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or be submitted on a Form 6A (to be designated as Out of Service) no later than no later than November 1, 2022.2) The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status.
EngineerForm: (02)
403780071
08/14/2024
Drilling/Completion Operations Operator to control emissions and venting during flowback.
EngineerForm: (02)
403780071
08/14/2024
Drilling/Completion Operations Operator to submit a Form 5A to document new formation completion
EngineerForm: (04)
403921765
09/25/2024
If flowback event last more than 4 days, reach out to ECMC for further guidelines.
EngineerForm: (04)
403921765
09/25/2024
The residual gas will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. Operator shall manage this well so that production volumes do not exceed the combustor capacity.
EngineerForm: (04)
403921765
09/25/2024
If well becomes a producing well, it will be shut in and a Gas Capture Plan will be submitted.
 