Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06317
Well Classification: OW Status: AP - 8/28/2024
Well Name/No:CRAIG #7-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KTM OPERATING LLC - 10722
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:APStatus Date8/28/2024
FacilityID:294991LocationID:309616
County:LINCOLN #073Location:SWNE 34 13S55W 6
Field:BOLERO - #7153Elevation:5062 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1470FNL  2560 FELLat/Long: 38.875710 / -103.543150Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 38.875710 / -103.543150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AP - 8/28/2024             Measured TD: 7584 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AP - 8/28/2024
Wellbore PermitVERTICAL
Permit #: Expiration Date:8/27/2027
Proposed Depth/Form:7584 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 396 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 325, Top: 0 ft., Bottom: 396 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2680 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 2680 ft.
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7580 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 450, Top: 5500 ft., Bottom: 7580 ft.
Casing:String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 2715 ft., Bottom: 3588 ft.

Wellbore Completed
Completion Date:10/29/2008
Spud Date:10/5/2008Spud Date Is:ACTUAL
Measured TD:7584 ft.Measured PB depth:7512 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Log Types:DENSITY NEUTRON, DUAL INDUCTION, CBL
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 396 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 396 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2680 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 2680 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 200 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 200 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7580 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 6600 ft., Bottom: 7580 ft., Determination Method: CBL
Casing:String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: 3588 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 2590 ft., Bottom: 3588 ft., Determination Method: CALC
Casing:String Type: S.C. 2.2, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6606 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 5500 ft., Bottom: 6606 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3588 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 2700 ft., Bottom: 3588 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT HAYS2708 ft.NN
D SAND3231 ft.NN
MARMATON6188 ft.NN
CHEROKEE6438 ft.NN
ATOKA6677 ft.NN
MORROW7080 ft.NN
MISSISSIPPIAN7319 ft.NN
ARBUCKLE7524 ft.NN

Formation MSSP                     Formation Classification:  OW                     Status:  AB - 3/5/2018                  Interval Top: 7335 ft.    Interval Bottom: 7500 ft.

 Completed Information for Formation MISSISSIPPIAN
1st Production Date:N/AChoke Size: 
Formation Name:MISSISSIPPIANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/6/2013Treatment End Date:N/A
Treatment Summary:CIBP set on 3-6-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/10/2008
Treatment Summary:11/7/08 PERFORATE MISSISSIPPIAN FROM 7495-7500, 7383-7400 & 7335-7340, TOTAL 108 HOLES
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MSSP.
Perforation Data:
Interval Top:7335 ft.# Of Holes:108
Interval Bottom:7500 ft.Hole Size:0.4 in.

Formation ATOK                     Formation Classification:  OW                     Status:  AB - 3/5/2018                  Interval Top: 6735 ft.    Interval Bottom: 6980 ft.

 Completed Information for Formation ATOKA
1st Production Date:N/AChoke Size: 
Formation Name:ATOKACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/6/2013Treatment End Date:N/A
Treatment Summary:CIBP set on 3-6-2013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/4/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 56
BBLS_OIL 24
BTU_GAS 1134
CALC_BBLS_H2O 144
CALC_BBLS_OIL 65
CALC_GOR 0
GRAVITY_OIL 36
Perforation Data:
Interval Top:6735 ft.# Of Holes:450
Interval Bottom:6980 ft.Hole Size:0.4 in.

Formation CHRK                     Formation Classification:  OW                     Status:  AB - 3/5/2018                  Interval Top: 6434 ft.    Interval Bottom: 6606 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:N/AChoke Size: 
Formation Name:CHEROKEECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/6/2013Treatment End Date:N/A
Treatment Summary:CIBP was set on 3-6- 2013.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/4/2009
Treatment Summary:4/28/09 ACIDIZE CHEROKEE W/1000 GAL 15% HCL. 4/30/09 FRAC CHEROKEE W/ 101,125 # 20/40 WHITE SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 127
BBLS_OIL 0
CALC_BBLS_H2O 254
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:6434 ft.# Of Holes:108
Interval Bottom:6606 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No