Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06317
Well Classification: OW Status: AP - 8/28/2024
Well Name/No:CRAIG #7-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KTM OPERATING LLC - 10722
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:APStatus Date8/28/2024
FacilityID:294991LocationID:309616
County:LINCOLN #073Location:SWNE 34 13S55W 6
Field:BOLERO - #7153Elevation:5062 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1470FNL  2560 FELLat/Long: 38.875710 / -103.543150Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 38.875710 / -103.543150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AP - 8/28/2024             Measured TD: 7584 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AP - 8/28/2024
Wellbore PermitVERTICAL
Permit #: Expiration Date:8/27/2027
Proposed Depth/Form:7584 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 396 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 325, Top: 0 ft., Bottom: 396 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2680 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 0 ft., Bottom: 2680 ft.
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7580 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 450, Top: 5500 ft., Bottom: 7580 ft.
Casing:String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 2715 ft., Bottom: 3588 ft.

Wellbore Completed
Completion Date:10/29/2008
Spud Date:10/5/2008Spud Date Is:ACTUAL
Measured TD:7584 ft.Measured PB depth:7512 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Log Types:DENSITY NEUTRON, DUAL INDUCTION, CBL
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 396 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 396 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2680 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 2680 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 200 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 200 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7580 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 6600 ft., Bottom: 7580 ft., Determination Method: CBL
Casing:String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: 3588 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 2590 ft., Bottom: 3588 ft., Determination Method: CALC
Casing:String Type: S.C. 2.2, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6606 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 5500 ft., Bottom: 6606 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3588 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 2700 ft., Bottom: 3588 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FORT HAYS2708 ft.NN
D SAND3231 ft.NN
MARMATON6188 ft.NN
CHEROKEE6438 ft.NN
ATOKA6677 ft.NN
MORROW7080 ft.NN
MISSISSIPPIAN7319 ft.NN
ARBUCKLE7524 ft.NN

Formation MSSP                     Formation Classification:  OW                     Status:  AB - 3/5/2018                  Interval Top: 7335 ft.    Interval Bottom: 7500 ft.

 Completed Information for Formation MISSISSIPPIAN
1st Production Date:N/AChoke Size: 
Formation Name:MISSISSIPPIANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/6/2013Treatment End Date:N/A
Treatment Summary:CIBP set on 3-6-13
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/10/2008
Treatment Summary:11/7/08 PERFORATE MISSISSIPPIAN FROM 7495-7500, 7383-7400 & 7335-7340, TOTAL 108 HOLES
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MSSP.
Perforation Data:
Interval Top:7335 ft.# Of Holes:108
Interval Bottom:7500 ft.Hole Size:0.4 in.

Formation ATOK                     Formation Classification:  OW                     Status:  AB - 3/5/2018                  Interval Top: 6735 ft.    Interval Bottom: 6980 ft.

 Completed Information for Formation ATOKA
1st Production Date:N/AChoke Size: 
Formation Name:ATOKACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/6/2013Treatment End Date:N/A
Treatment Summary:CIBP set on 3-6-2013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/4/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 56
BBLS_OIL 24
BTU_GAS 1134
CALC_BBLS_H2O 144
CALC_BBLS_OIL 65
CALC_GOR 0
GRAVITY_OIL 36
Perforation Data:
Interval Top:6735 ft.# Of Holes:450
Interval Bottom:6980 ft.Hole Size:0.4 in.

Formation CHRK                     Formation Classification:  OW                     Status:  AB - 3/5/2018                  Interval Top: 6434 ft.    Interval Bottom: 6606 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:N/AChoke Size: 
Formation Name:CHEROKEECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/6/2013Treatment End Date:N/A
Treatment Summary:CIBP was set on 3-6- 2013.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/4/2009
Treatment Summary:4/28/09 ACIDIZE CHEROKEE W/1000 GAL 15% HCL. 4/30/09 FRAC CHEROKEE W/ 101,125 # 20/40 WHITE SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 127
BBLS_OIL 0
CALC_BBLS_H2O 254
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:6434 ft.# Of Holes:108
Interval Bottom:6606 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No