Agency | Form: (02 ) 2585682 3/26/2010 | 1)Provide 48 hour notice of spud to COGCC field inspector Leslie Melton (970) 375-6419 or les.melton@state.co.us 2)Provide cement coverage of production casing from TD to surface. Verify cement coverage with Cement Bond Log. 3)Run and submit Directional Survey from TD to kick-off point 4)The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the well bore complies with setback requirements in Commission orders and/or rules prior to producing the well. 5)Sample and test two closest water wells within 1/4 mile swath of the directional wellbore intercepting Fruitland Coal (includes pathway from top to bottom of pay). 6)Operators are required to obtain a bottom hole pressure utilizing a bottom hole gauge after a minimum 48 hour shut-in period following completion and prior to sales 7)Comply with all applicable provisions of Order 112-214 |