| Engineer | Form: (02) 400504027 12/11/2013 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON-FIELD NOTICE TO OPERATORS IS REQUIRED.
(3) CEMENT ON PRODUCTION CASING MUST BE A MINIMUM OF 200’ ABOVE THE TOP OF THE MESA-VERDE FORMATION (OR 200’ ABOVE THE OHIO CREEK FORMATION IF PRESENT). CEMENT TOP VERIFICATION BY CBL IS REQUIRED.
(4) APPROVAL OF THIS FORM DOES NOT AUTHORIZE INJECTION. AUTHORIZATION TO INJECT REQUIRES APPROVAL OF FORM 31 AND FORM 33.
(5) BEFORE STIMULATING THE WELL, CAPTURE A WATER SAMPLE FROM [INSERT FORMATION(S) REQUESTED FOR INJECTION] AND ANALYZE FOR TOTAL DISSOLVED SOLIDS. SUBMIT LAB ANALYSIS TO DENISE.ONYSKIW@STATE.CO.US and BOB.KOEHLER@STATE.CO.US
|
| Permit | Form: (02) 400504027 02/06/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
|
| Permit | Form: (04) 400629189 06/19/2014 | The operator will submit updated informatioin as to the production allocation on this well. Will also furnish an SUA stating that the surface owner is aware that minerals otherthan their own will be produced from this surface location. |
| Permit | Form: (02) 400625876 06/20/2014 | The operator will submit updated information as to the production allocation on this well. Will also furnish an SUA stating that the surface owner is aware that minerals other than their own will be produced from this surface location. |
| Engineer | Form: (02) 400625876 06/24/2014 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. SEE ATTACHED NOTICE.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON FIELD NOTICE TO OPERATORS IS REQUIRED, WITH THE FOLLOWING EXCEPTION: ALL FIELD NOTICE REQUIREMENTS SPECIFIED IN THIS NOTICE TO OPERATORS ARE SUPERSEDED BY THE REQUIREMENTS OF THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY (SEE CONDITION OF APPROVAL #1). SEE ATTACHED NOTICE.
(3) CEMENT ON PRODUCTION CASING MUST BE A MINIMUM OF 200' ABOVE THE TOP OF THE MESA VERDE FORMATION (OR 200' ABOVE THE OHIO CREEK FORMATION IF PRESENT). CEMENT TOP VERIFICATION BY CBL IS REQUIRED.
|
| Engineer | Form: (02) 400675332 09/10/2014 | COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. SEE ATTACHED NOTICE.
|
| UIC | Form: (02) 400675332 10/30/2014 | 1. Daily drilling reports are required.
2. A static water level taken after perforation in cased wells and prior to any stimulation in either cased or open-hole wells.
3. Retrieve water sample(s) from injection zone(s) before stimulating formation, Step Rate Test, or Injectivity Test.
4. A Transient Injectivity Test is required to determine the Maximum Daily Injection Rate in barrels per day (bbls/day).
5. A Transient Injectivity Test or a Step Rate Test is required to determine the Maximum Injection Pressure in pounds per square inch (psi).
6. Prior approval of Form 4 is required for Step Rate and Injectivity Tests.
7. Injection is not authorized until approval of Forms 31 and 33. |