Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22333
Well Classification: DSPW Status: IJ - 9/1/2025
Well Name/No:Clough #RWF 933-19D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27868
Facility Status:IJStatus Date9/1/2025
FacilityID:436058LocationID:324057
County:GARFIELD #045Location:SWNW 20 6S94W 6
Field:RULISON - #75400Elevation:5528 ft.
Basin:PICEANCE BASIN  
Planned Location:2399FNL  197 FWLLat/Long: 39.511093 / -107.920509Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.511093 / -107.920509Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/31/2014
End Date: 6/1/2014
Reported: 7/23/2014
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: IJ - 9/1/2025             Measured TD: 9683 ft.    Vertical TD: 9124 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        IJ - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/30/2016
Proposed Top PZ Location:Sec:19 Twp: 6S 94W Footage: 2529 FSL  2172 FEL
Bottom Hole Location:Sec:19 Twp: 6S 94W Footage: 2525 FSL  2168 FEL
Proposed Depth/Form:9659 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2514 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 630, Top: 0 ft., Bottom: 2514 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 9659 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1655, Top: 1500 ft., Bottom: 9659 ft.

Wellbore Completed
Completion Date:5/11/2014
Spud Date:4/21/2014Spud Date Is:ACTUAL
Measured TD:9683 ft.Measured PB depth:9611 ft.
True Vertical TD:9124 ft.True Vertical PB depth:9052 ft.
Top PZ Location:Sec:19 Twp: 6S 94WFootage: 2529 FSL  2172 FEL
Bottom Hole Location:Sec:19 Twp: 6S 94WFootage: 2525 FSL  2168 FEL
Log Types:SP/GR/HDIL/ZDL/CN/MUD and CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2514 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 0 ft., Bottom: 2514 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 9659 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 1655, Top: 1500 ft., Bottom: 9659 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: , Depth: 4319 ft., Bottom: , Sacks: , Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2040 ft.
MESAVERDE5062 ft.
CAMEO7708 ft.
ROLLINS8648 ft.
COZZETTE8985 ft.
CORCORAN9274 ft.

Formation CRCRN                   Formation Classification:  DSPW                   Status:  IJ - 9/1/2025                  Interval Top: 9285 ft.    Interval Bottom: 9394 ft.

 Completed Information for Formation CORCORAN
1st Production Date:6/20/2014Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/31/2014Treatment End Date:5/31/2014
Treatment Summary:1005 Gals 7 1/2% HCL; 259400#40/70 Sand; 9387 Bbls Slickwater; (Summary)
Total fluid used in treatment (bbls):9410Max pressure during treatment (psi):6487
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):9387Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):259400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:3.5 in.Tubing Setting Depth:8933 ft.
Tubing Packer Depth:8920 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:9285 ft.# Of Holes:26
Interval Bottom:9394 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  DSPW                     Status:  IJ - 9/1/2025                  Interval Top: 9017 ft.    Interval Bottom: 9155 ft.

 Completed Information for Formation COZZETTE
1st Production Date:6/20/2014Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/1/2014Treatment End Date:6/1/2014
Treatment Summary:1000 Gals 7 1/2% HCL; 304000#20/40 Sand; 10894 Bbls Slickwater; (Summary)
Total fluid used in treatment (bbls):10918Max pressure during treatment (psi):6796
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):10894Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):304000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:3.5 in.Tubing Setting Depth:8933 ft.
Tubing Packer Depth:8920 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:9017 ft.# Of Holes:26
Interval Bottom:9155 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No