| Wildlife | Form: (02 ) 400374640 3/20/2013 | Minimize the number, length and footprint of oil & gas development roads
Use existing routes where possible
Combine utility infrastructure planning (gas, electric & water) when possible with roadway planning to avoid separate utility corridors
Coordinate Employee transport when possible
Reduce visits to well-sites through remote monitoring (i.e. SCADA) and the use of multi-function contractors. Maximize use of state-of-the-art drilling technology (e.g., high efficiency rigs, coiled-tubing unit rigs, closed-loop or pitless drilling, etc.) to minimize disturbance.
Reclaim mule deer and elk habitats with native shrubs, grasses, and forbs appropriate to the ecological site disturbed.
|
| Construction | Form: (02 ) 400374640 3/20/2013 | (Not all are used all the time)
Terminal Containment, Diversions, Run-On Protection, Tracking, Benching, Terracing, ECM (Erosion Control Mulch), ECB (Erosion Control Blanket), Check Dams, Seeding, Mulching, Water Bars, Stabilized Unpaved Surfaces (Gravel), Stormwater & Snow Storage Containment, Scheduling, Phased Construction, Temporary Flumes, Culverts with inlet & outlet protection, Rip Rap, TRM (Turf Reinforcement Mats), Maintenance, Scheduling, Phased Construction, Fueling BMP's, Waste Management BMP's, Materials Handling BMP's
|
| Pre-Construction | Form: (02 ) 400374640 3/20/2013 | Wattles, Silt Fence, Vegetation Buffers, Slash, Topsoil Windrows (diversions & ROP's), Scheduling, Phased Construction |
| Interim Reclamation | Form: (02 ) 400374640 3/20/2013 | Maintenance
Revegetation Monitoring
BMP maintenance & monitoring
Weed Management
|