|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2025 Measured TD: 9818 ft. Vertical TD: 9723 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/19/2015 | | Proposed Top PZ Location: | Sec:6 Twp: 8S 92W | Footage: 976 FSL 1413 FEL | | Bottom Hole Location: | Sec:6 Twp: 8S 92W | Footage: 981 FSL 1378 FEL | | Proposed Depth/Form: | 9877 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Hunter Mesa | Unit Number: | COC055972X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: .25" wall, Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1348 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 483, Top: 0 ft., Bottom: 1348 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9877 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1070, Top: 0 ft., Bottom: 9877 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/6/2013 | | Spud Date: | 8/21/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 9818 ft. | Measured PB depth: | 9710 ft. | | True Vertical TD: | 9723 ft. | True Vertical PB depth: | 9615 ft. | | Top PZ Location: | Sec:6 Twp: 8S 92W | Footage: 976 FSL 1413 FEL | | Bottom Hole Location: | Sec:6 Twp: 8S 92W | Footage: 981 FSL 1378 FEL | | Log Types: | Temp log | | Log Types: | CBL, RST, Mud, PEX logs | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 66 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 114, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1353 ft., Weight: 36.0 , Citings Type: ACTUAL | | Cement: | Sacks: 485, Top: 0 ft., Bottom: 1353 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9798 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 996, Top: 4498 ft., Bottom: 9798 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 5055 ft. | 8540 ft. | | | | ROLLINS | 8540 ft. | 9818 ft. | | |
Formation ILES Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 9028 ft. Interval Bottom: 9395 ft.| Completed Information for Formation ILES | | 1st Production Date: | 5/3/2014 | Choke Size: | | | Formation Name: | ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/27/2013 | Treatment End Date: | 12/29/2013 | | Treatment Summary: | Stage 1 - Stage 2 treated with a total of: 28,000 bbls of Slickwater (BWS). | | Total fluid used in treatment (bbls): | 28000 | Max pressure during treatment (psi): | 1053 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 28000 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8443 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/14/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1115 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 1115 | | CALC_MCF_GAS | 1575 | | CASING_PRESS | 2600 | | MCF_GAS | 1575 | | TUBING_PRESS | 1525 |
| | Perforation Data: | | Interval Top: | 9028 ft. | # Of Holes: | 54 | | Interval Bottom: | 9395 ft. | Hole Size: | 0.38 in. |
|
Formation WMFK Formation Classification: GW Status: SI - 8/1/2025 Interval Top: 6670 ft. Interval Bottom: 8443 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 5/3/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/1/2014 | Treatment End Date: | 1/15/2014 | | Treatment Summary: | Stage 3 - Stage 9 treated with a total of: 114,285 bbls of Slickwater (BWS). | | Total fluid used in treatment (bbls): | 114285 | Max pressure during treatment (psi): | 873 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 114285 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8443 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/14/2014 | Test Method: | Flows from well | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1115 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 1115 | | CALC_MCF_GAS | 1575 | | CASING_PRESS | 2600 | | MCF_GAS | 1575 | | TUBING_PRESS | 1525 |
| | Perforation Data: | | Interval Top: | 6670 ft. | # Of Holes: | 189 | | Interval Bottom: | 8443 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 14 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.005 |
| Average MCFE per Day | 0.038 |
| Federal Financial Assurance | i | Y |
|
|