Engineer | Form: (04 ) 401808355 11/8/2021 | A Form 42, Notice of Field Operations should be submitted indicating presence of hydrogen sulfide. |
Engineer | Form: (04 ) 401808355 11/8/2021 | Operator shall have an approved Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022. |
Engineer | Form: (04 ) 401808355 11/8/2021 | Produced gas volumes are to be metered and reported and all gas used onsite documented in Form 7 Monthly Report of Operations.
Operator shall provide details of gas usage onsite by providing how it is used and the requirements by equipment type. Provide this data via Sundry Form 4 Other by November 22, 2021. |