|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2019 Measured TD: 8261 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2019 | Wellbore Permit | | Permit #: | 20071666 | Expiration Date: | 4/17/2008 | Proposed Depth/Form: | 8311 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 80, Drill Unit: E2SW | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: E2SW |
| | |
Wellbore Completed | Completion Date: | 7/11/2007 | Spud Date: | 7/6/2007 | Spud Date Is: | ACTUAL | Measured TD: | 8261 ft. | Measured PB depth: | 8240 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CEMENT BOND/TRIPLE COMBO | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1750 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1100, Top: 0 ft., Bottom: 1750 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8244 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 226, Top: 6854 ft., Bottom: 8244 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7290 ft. | | N | N | CODELL | 7670 ft. | | N | N | J SAND | 8094 ft. | 8130 ft. | N | N |
Formation JSND Formation Classification: GW Status: SI - 1/1/2019 Interval Top: 8100 ft. Interval Bottom: 8120 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/4/2007 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/15/2007 | Treatment Summary: | VOLUMES: PAD VOLUME 215 BBLS CROSSLINKED 114 BBLS LIGHTNING PAD, SLF 648 BBLS CROSSLINKED. AVERAGE PRESSURE 4753; FLUSH VOLUME 126 BBLS. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8082 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/21/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 11 | BTU_GAS | 801 | CALC_BBLS_H2O | 3 | CALC_BBLS_OIL | 11 | CALC_GOR | 5636 | CALC_MCF_GAS | 62 | CASING_PRESS | 780 | GRAVITY_OIL | 47 | MCF_GAS | 62 | TUBING_PRESS | 580 |
| Perforation Data: | Interval Top: | 8100 ft. | # Of Holes: | 56 | Interval Bottom: | 8120 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 09/30/2018 |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|