Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION430346Tebo 3
1H
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
3/1/2025
DJ HORIZONTAL NIOBRARA
16950
ARAPAHOE  005
NENE 3 5S64W 6
430346View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
402289863
08/11/2020
Operator shall submit additional Location Pictures showing greater interior of the Location and individual facilities via Form 4 Sundry, within 45 days upon receipt of the Amended Form 2A.
OGLAForm: (02A)
402289863
09/10/2020
OReference Area Pictures taken during the growing season with 12 months from approval of the Form 2A.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400312526
10/1/2012
ConocoPhillips has adopted the Colorado Oil and Gas Association (COGA) voluntary groundwater testing program to establish baseline groundwater quality conditions around new oil well locations in their leased area. The sampling program will allow the company (ConocoPhillips) to evaluate the groundwater conditions before drilling a well and also to monitor water quality afterward. The program will be in accordance with the guidance set forth in the Voluntary Baseline Groundwater Quality Sampling Program last updated on November 15, 2011. Under the sampling protocol, water samples would be collected from the two closest groundwater sources with reasonable access. The sample points, permitted or registered wells, would located within ½ mile of the proposed well surface location. Sampling will be conducted based on the landowner granting access to the well location and agreeing to have the laboratory analytical results submitted to COGCC for posting to a database viewable by the public. Samples will be analyzed for the constituents listed in Table 1 of the Groundwater Sampling and Analytical Program.
Storm Water/Erosion ControlForm: (02A )
402289863
9/15/2020
Opeartor will install stormwater controls around the perimeter of the location prior to construction. They will remain in place through final reclamation or until pad is stabilized.
Material Handling and Spill PreventionForm: (02A )
402289863
9/15/2020
Secondary Containment All facilities will be equipped with remote monitoring and remote shut down, which includes isolation at the well head. Engineered liner systems will be used in secondary steel containment systems for tank batteries. Pollution control containers (spill boxes) will be used on truck loading lines and placed within the limits of the secondary containment system. Automatic shutdown level devices will be installed on each tank with remote monitoring capabilities. Automatic shutdown level devices will be installed on all pressure vessels and liquid knockouts. Automatic shutdown pressure devices will be installed on flowlines from well heads to facilities with remote monitoring capabilities. Additionally, cathodic protection will be used on buried steel lines to mitigate corrosion. Automatic shutdown pressure devices will be installed on process vessels with remote monitoring capabilities.
Emissions mitigationForm: (02A )
402289863
9/15/2020
Emissions Controls Combustors will be available at the Location during the entire production phase to eliminate fugitive emissions in the event of maintenance or emergency use. The device will be fired using natural gas and operate with a 98% or higher hydrocarbon destruction efficiency. The device will be designed and operated in a manner that will ensure no visible emissions during normal operation. Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, Operator shall not produce the wells without an approved variance per Rule 805.b.(3)C.