Skip to Main Content

COGIS

Facility Detail

COGIS - LOCATION INFORMATION

Click image to view related facilities. RelatedClick image to view inspection information. InspView GIS GISClick image to view imaged documents for this well/facility. DocClick image to view facility COAs and BMPs. COAClick image to search for orders within this facility's section. Orders
Tebo 3 - #430346 InformationStatus: AC - 3/1/2025
Location ID:430346Location Name/No:Tebo 3/1H
(Click Location Name for Water Production Data)
Facility Status:ACFacility Status Date:3/1/2025
Operator Name:CRESTONE PEAK RESOURCES OPERATING LLCOperator Number:10633
County:ARAPAHOE  - #005Location:NENE 3 5S64W
Facility Type:LOCATIONLat/Long:39.650019 / -104.529994
Basin:DENVER (DJ) BASIN  
Form 2A Document #:402289863Form 2A Expiration:9/14/2023
Location Inventory
Wells:  1Oil Tanks:  3Condensate Tanks:  0Water Tanks:  1Buried Produced Water Vaults:  0
Drilling Pits:  0Production Pits:  0Special Purpose Pits:  0Multi-Well Pits:  0Modular Large Volume Tanks:  0
Pump Jacks:  1Separators:  2Injection Pumps:  0Heat-Treaters:  0Cavity Pumps:  0
Gas Compressors:  0Gas or Diesel Motors:  0Electric Motors:  4Electric Generators:  0Fuel Tanks:  0
LACT Unit:  0Dehydrator Units:  0Vapor Recovery Unit:  0VOC Combustor:  1Flare:  1
Enclosed Combustion Devices:  0Meter/Sales Building:  0Pigging Station:  0
Other:  From the wellhead(s), 3” carbon steel flowline(s) run to an inlet manifold which routes flow to 2 phase separation. High pressure gas from the 2 phase separator(s) is sent down the sales gas line to a third party. The liquid from the 2 phase separator(s) is carried to 3 phase separation for further processing. Low pressure gas off the 3 phase separator(s) and VRT is sent to a vapor recovery unit to compress the low pressure gas so it can be sent down the high pressure sales line to a third party. If a VRU is not present the low pressure gas is routed to enclosed combustion devices for destruction. Oil from 3 phase separation is transferred to a vapor recovery tower then to tankage for storage and eventual sales. Water from 3 phase separation is transferred to the water tanks for storage and eventual disposal.
 
Related Tank Facilities
Sorry, no associated tank facilities could be found.
Related Pits
Sorry, no associated pits could be found.
Wells
API Number:05-005-07197Operator Name:CRESTONE PEAK RESOURCES OPERATING LLC #10633Well Name:  Tebo 3 #1H
Well Status:SILocation:  NENE 3 5s 64W

Off-Location Flowlines
Sorry, no off-location flowlines could be found.
Domestic Taps
Sorry, no domestic taps could be found.