| Planning | Form: (02A ) 401789328 11/30/2018 | Use or modify existing roads where possible.
Maximize the use of directional drilling to minimize habitat loss/fragmentation.
Maximize use of remote telemetry for well monitoring to minimize traffic. |
| Wildlife | Form: (02A ) 401789328 11/30/2018 | September 2017 - Caerus Piceance LLC (Caerus) agreed to the Amended and Restated Wildlife Mitigation Plan (WMP) for Encana’s proposed oil and gas operations on the North Parachute Ranch (NPR) property. Caerus received authorization from
Colorado Parks and Wildlife (CPW) to transfer the EnCana Wildlife Mitigation Plan Agreement (WMPA) to Caerus’ existing WMPA. Caerus is currently adhering to all aspects of both WMPAs through Caerus’ current best management practices. |
| Construction | Form: (02A ) 401789328 11/30/2018 | The well pad location is built and will need expansion.
Any stockpile(s) for topsoil and excess cut material will be located in work areas surrounded by the BMPs, all erosion control and stormwater run-on / run-off control measures will; be installed as shown on the Construction Layout Drawings, Location Drawing, Facility Layout Drawing, and Proposed BMPs attachments. These site-specific BMPs will be revised as necessary based on site conditions, protected, inspected at regular intervals, and repaired as necessary.
Disturbed area of site will be left in a surface roughened condition when feasible.
Dust mitigation practices will be utilized.
Existing buried gas pipelines and water pipelines are in place. Any new flowline installations will be performed in accordance with the new flowline 1100-Series Rules and recent guidance provided by the COGCC.
Berms or other containment devices around permanent production storage tanks, shall be constructed to be sufficiently impervious (corrugated steel with synthetic liner) to adequately contain any spilled or released material to prevent any significant adverse environmental impacts. |
| Drilling/Completion Operations | Form: (02A ) 401789328 11/30/2018 | Closed loop system will be used. No pits will be built. An enclosed flare stack will be used.
Caerus will ensure 110 percent secondary containment for any potential volume of fluids that may be contained on location during operations which may have the potential to be released. |
| Interim Reclamation | Form: (02A ) 401789328 11/30/2018 | Once all topsoil has been distributed across the site, the location is then seeded by drill seeding methods or broadcast seeding.
Re-vegetation is accomplished as soon as practical following the preparation of a site for final stabilization. Seeding will be done when seasonal or weather conditions are most favorable.
On terrain where drill seeding is appropriate, seed may be planted using a drill equipped with a depth regulator to ensure proper depth of planting.
Where possible, recountouring to help control run-on and run-off will be done. |
| Final Reclamation | Form: (02A ) 401789328 11/30/2018 | Re-contouring: The disturbed areas surrounding the well location, including the access road will be re-contoured to blend as nearly possible with the natural topography.
Final grading of back-filled and cut slopes will be done to prevent erosion and encourage establishment of vegetation. Existing drainages will be re-established.
Re-vegetation: The long term objective is to establish a self-perpetuating plant community that is compatible with and capable of supporting the identified land use.
Noxious weeds will be treated in accordance with applicable COGCC rules. |