COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
403229374
1/17/2023
1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara and from 500’ below Sussex to 500’ above Sussex. Verify coverage with a cement bond log.
EngineerForm: (02 )
403229374
1/17/2023
Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. 123-07256 J J WARDELL 'B' #1 123-07670 STATE #23 123-10438 B B DRAW H FEDERAL #4-4J 123-10535 B B DRAW H #3-3J 123-12720 ARISTOCRAT #42-4C 123-13323 BEEBE DRAW UPPR #42-9 #4 123-13659 ARISTOCRAT ANGUS #22-4 123-13660 ARISTOCRAT ANGUS #24-4 123-13661 ARISTOCRAT ANGUS #31-4 123-13662 ARISTOCRAT ANGUS #33-4 123-14204 BEEBE DRAW UPRR #41-17 123-14203 BEEBE DRAW UPRR #32-17 123-14205 BEEBE DRAW UPRR #42-17 123-14455 UPRR 22 PAN AM #UNIT "T" #1 123-14736 BEEBE DRAW UPRR #32-9 123-15052 MEGAN H #16-10 123-15076 MEGAN H #16-7 123-15111 MEGAN H #16-2 123-15112 MEGAN H #16-6 123-15114 MEGAN H #16-2J 123-16449 ARISTOCRAT ANGUS #13-4 123-16572 ARISTOCRAT ANGUS #23-4C 123-17032 ARISTOCRAT ANGUS #14-10 123-17136 FEDERAL #12-10 123-17263 HSR-RICHARDS #16-9A 123-17304 HSR-OBORNE #9-5 123-20457 BB Draw Federal #H04-07JI 123-22396 ARISTOCRAT ANGUS FEDERAL #1-2-10
EngineerForm: (02 )
403229374
1/17/2023
Operator acknowledges the proximity of the listed non-operated well. Operator assures that this offset will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document Operator using Option 3. Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. 123-13323 BEEBE DRAW UPPR #42-9 #4
EngineerForm: (02 )
403229374
1/17/2023
Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document (option 4). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Surface and production casing pressures of this offset well list will be actively monitored during the entire stimulation treatment of this pad. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and COGCC Engineering notified. 123-29341 MOSER #27-21 123-31770 MOSER #H28-30 123-35347 REI H #17-21D 123-44609 Centennial State #G34-612 123-46838 Lory #9N 123-46854 Lory #8N
EngineerForm: (02 )
403229374
1/17/2023
Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test: 1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation. 2) If a delayed completion, a second test is required between 6-9 months after rig release and must be conducted prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation. 3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
PermitForm: (06 )
403356732
3/29/2023
Submit a Form 5, Drilling Completion Report, within 30 days for compliance to Rule 414.b.(3).
EngineerForm: (06 )
403356732
3/29/2023
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l. 2) Pump surface casing plugs only after isolation has been verified. Circulate cement to surface. 3) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 4) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
EngineerForm: (06 )
403356732
3/29/2023
Cement placement in or above groundwater zones to be performed in a manner that does not initiate hydraulic fractures.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
403229374
1/30/2023
KMOG acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29,2012
Drilling/Completion OperationsForm: (02 )
403229374
1/30/2023
Anti-Collision: KMOG will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within 150 feet prior to drilling.
Drilling/Completion OperationsForm: (02 )
403229374
1/30/2023
Open Hole Logging Exception: One of the first wells drilled on the pad will be logged with cased-hole neutron log with gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production (or intermediate casing if a production liner is run_ into the surface casing. The horizontal portion of every well will be logged with a measured-while drilling gamma-ray long. The Form 5, Completion Report, for each well on the pad will list all logs run in that well and have those logs attached. The Form 5 for each well shall state "Open Hole Logging Exception-No open-hole logs were run" and shall clearly identify the type of log and the well (by API number) in which open-hole logs were run.