Engineer | Form: (02 ) 403229374 1/17/2023 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara and from 500’ below Sussex to 500’ above Sussex. Verify coverage with a cement bond log. |
Engineer | Form: (02 ) 403229374 1/17/2023 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-07256 J J WARDELL 'B' #1
123-07670 STATE #23
123-10438 B B DRAW H FEDERAL #4-4J
123-10535 B B DRAW H #3-3J
123-12720 ARISTOCRAT #42-4C
123-13323 BEEBE DRAW UPPR #42-9 #4
123-13659 ARISTOCRAT ANGUS #22-4
123-13660 ARISTOCRAT ANGUS #24-4
123-13661 ARISTOCRAT ANGUS #31-4
123-13662 ARISTOCRAT ANGUS #33-4
123-14204 BEEBE DRAW UPRR #41-17
123-14203 BEEBE DRAW UPRR #32-17
123-14205 BEEBE DRAW UPRR #42-17
123-14455 UPRR 22 PAN AM #UNIT "T" #1
123-14736 BEEBE DRAW UPRR #32-9
123-15052 MEGAN H #16-10
123-15076 MEGAN H #16-7
123-15111 MEGAN H #16-2
123-15112 MEGAN H #16-6
123-15114 MEGAN H #16-2J
123-16449 ARISTOCRAT ANGUS #13-4
123-16572 ARISTOCRAT ANGUS #23-4C
123-17032 ARISTOCRAT ANGUS #14-10
123-17136 FEDERAL #12-10
123-17263 HSR-RICHARDS #16-9A
123-17304 HSR-OBORNE #9-5
123-20457 BB Draw Federal #H04-07JI
123-22396 ARISTOCRAT ANGUS FEDERAL #1-2-10 |
Engineer | Form: (02 ) 403229374 1/17/2023 | Operator acknowledges the proximity of the listed non-operated well. Operator assures that this offset will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document Operator using Option 3. Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-13323 BEEBE DRAW UPPR #42-9 #4 |
Engineer | Form: (02 ) 403229374 1/17/2023 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document (option 4). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Surface and production casing pressures of this offset well list will be actively monitored during the entire stimulation treatment of this pad. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and COGCC Engineering notified.
123-29341 MOSER #27-21
123-31770 MOSER #H28-30
123-35347 REI H #17-21D
123-44609 Centennial State #G34-612
123-46838 Lory #9N
123-46854 Lory #8N |
Engineer | Form: (02 ) 403229374 1/17/2023 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
2) If a delayed completion, a second test is required between 6-9 months after rig release and must be conducted prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
|
Permit | Form: (06 ) 403356732 3/29/2023 | Submit a Form 5, Drilling Completion Report, within 30 days for compliance to Rule 414.b.(3). |
Engineer | Form: (06 ) 403356732 3/29/2023 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l.
2) Pump surface casing plugs only after isolation has been verified. Circulate cement to surface.
3) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation.
4) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
|
Engineer | Form: (06 ) 403356732 3/29/2023 | Cement placement in or above groundwater zones to be performed in a manner that does not initiate hydraulic fractures.
|