| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead
Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area
dated May 29, 2012. |
| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active
(producing, shut in, or temporarily abandoned) offset wellbores that have the potential
of being within one hundred fifty (150) feet of a proposed well prior to drilling
operations for the proposed well. Notice shall be given to all offset operators within
one hundred fifty (150) feet prior to drilling. |
| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | 317.p Logging Program: One of the first wells drilled on the pad will be logged with
Open Hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface
casing. All wells on the pad will have a cement bond log with gamma-ray run on
production casing (or on intermediate casing if production liner is run) into the surface
casing. The horizontal portion of every well will be logged with a measured-whiledrilling
gamma-ray log. The form 5, Completion Report, for each well on the pad will
list all logs run and have those logs attached. The Form 5 for a well without open-hole
logs shall clearly state "No open-hole logs were run" and shall clearly identify (by API#,
well name & number) the well in which open-hole logs were run. |
| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | 604c.(2).H. BOPE: Our rigs at a minimum will have a double ram with blind and pipe
ram and annular preventer. |
| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | 604c.(2).I. BOPE Testing for Drilling Operations: BOPEs will be tested upon rig-up
and, at a minimum, every 30 days. |
| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | 604c.(2).J. BOPE for Well Servicing Operations: Blowout prevention equipment will be
used on any servicing operations associated with this well. Backup stabbing valves will
be used during any future servicing operations during reverse circulation. Valves shall
be pressure tested before each well servicing operation using low-pressure air and
high-pressure fluid. |
| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | 604c.(2).K. Pit Level Indicators: All storage tanks used for active drilling operations
(used in lieu of pits) contain pit level monitors with Electronic Drilling Recorders (EDR).
KMG uses EDRs with pit level monitor(s) and alarm(s) for production rigs. Basic level
gauges are used on tanks utilized for the surface rig. |
| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | 604c.(2).L. Drill Stem Tests: No drill stem tests are planned and none will be
performed without prior approval from the Director. |
| Drilling/Completion Operations | Form: (02 ) 401657828 11/9/2018 | 803. Lighting: To the extent practicable, site lighting shall be shielded and directed
downward and inward toward operations to avoid glare on public roads and nearby
Building Units. |
| Drilling/Completion Operations | Form: (02 ) 402363101 11/2/2020 | Kerr-McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. |
| Drilling/Completion Operations | Form: (02 ) 402363101 11/2/2020 | Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling. |
| Drilling/Completion Operations | Form: (02 ) 402363101 11/2/2020 | Alternative Logging Program: One of the first wells drilled on the pad will be logged with open-hole resistivity log and gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall state “Alternative Logging Program - No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run. |