|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/13/2024 Measured TD: 16240 ft. Vertical TD: 7381 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/13/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 11/1/2022 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 66W | Footage: 842 FNL 1749 FEL | | Bottom Hole Location: | Sec:26 Twp: 1N 66W | Footage: 842 FNL 1749 FEL | | Proposed Depth/Form: | 16143 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16133 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1907, Top: , Bottom: 16133 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/18/2021 | | Spud Date: | 1/3/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 16240 ft. | Measured PB depth: | 16187 ft. | | True Vertical TD: | 7381 ft. | True Vertical PB depth: | 7380 ft. | | Top PZ Location: | Sec:26 Twp: 1N 66W | Footage: 2510 FNL 2018 FEL | | Bottom Hole Location: | Sec:23 Twp: 1N 66W | Footage: 67 FNL 2136 FEL | | Log Types: | | | Log Types: | CBL. LWD/MWD, Resistivity Logs have been run on the BEIERLE 26-4HZ API#05-123-40875 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 27.17 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1902 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 810, Top: 0 ft., Bottom: 1902 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16231 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1693, Top: 494 ft., Bottom: 16240 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4884 ft. | | | | | SUSSEX | 5297 ft. | | | | | SHARON SPRINGS | 7855 ft. | | | | | NIOBRARA | 7904 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 12/13/2024 Interval Top: 8437 ft. Interval Bottom: 16104 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/16/2021 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/22/2024 | Treatment End Date: | 6/23/2024 | | Treatment Summary: | Treatment Rate - 2-16 bpm
Surfactant - 370 gals
Acid Package - 5,926 gals
Biocide Package -79 gals
Scale Inhibitor - 56 gals
Chemical Diverter - 350 Lbs
Linear Gel - 20 gals
Breaker - 50 lbs
Crosslinker - 1.5 gals
Total fluid w/ Water 3358.00 bbls
| | Total fluid used in treatment (bbls): | 3358 | Max pressure during treatment (psi): | 1920 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 28 | | Total acid used in treatment (bbls): | 141 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 115 | | Fresh water used in treatment (bbls): | 3204 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 10/23/2021 | Treatment End Date: | 11/2/2021 | | Treatment Summary: | 457 BBL 20% HCR-7000 WL ACID; 95 BBL 7.5% HCL ACID; 10,769 BBL PUMP DOWN; 207,247 BBL SLICKWATER; 218,568 BBL TOTAL FLUID; 6,144,023 LBS WHITE 40/70 OTTAWA/ST. PETERS; 6,144,023 LBS TOTAL PROPPANT.
| | Total fluid used in treatment (bbls): | 218568 | Max pressure during treatment (psi): | 7944 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 28 | | Total acid used in treatment (bbls): | 552 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 1950 | Total flowback volume recovered (bbls): | 17192 | | Fresh water used in treatment (bbls): | 216066 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 6144023 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 226 | | BBLS_OIL | 494 | | BTU_GAS | 1370 | | CALC_BBLS_H2O | 226 | | CALC_BBLS_OIL | 494 | | CALC_GOR | 781 | | CALC_MCF_GAS | 386 | | CASING_PRESS | 1900 | | GRAVITY_OIL | 50 | | MCF_GAS | 386 | | TUBING_PRESS | 1400 |
| | Perforation Data: | | Interval Top: | 8437 ft. | # Of Holes: | 840 | | Interval Bottom: | 16104 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 14452 |
| Total Gas Produced (MCF) | 76736 |
| GOR | 5309 |
| GOR Determination | BOE |
| Average BOE per Day | 75.801 |
| Average MCFE per Day | 439.666 |
| Federal Financial Assurance | i | |
|
|