Drilling/Completion Operations | Form: (02 ) 401549896 6/9/2018 | Rule 317.p Requirement to Log a Well
One of the first wells drilled on the pad will be logged with an open-hole resistivity log with gamma-ray, from the kick-off point into the surface casing. All wells on the pad will have a cement bond log (CBL) with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run. |
Drilling/Completion Operations | Form: (02 ) 401549896 6/9/2018 | Operator will comply with COGCC Policy for Bradenhead Monitoring During Hydraulic
Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
|