Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47013
Well Classification: OW Status: PR - 4/1/2022
Well Name/No:North Platte #A11-E14-28HNB
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2022
FacilityID:455364LocationID:455363
County:WELD #123Location:NESW 21 5N63W 6
Field:WATTENBERG - #90750Elevation:4553 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1437FSL  1385 FWLLat/Long: 40.381683 / -104.445536Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.381683 / -104.445537Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/23/2018
End Date: 12/4/2018
Reported: 1/23/2019
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2022             Measured TD: 11737 ft.    Vertical TD: 6335 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/8/2020
Proposed Top PZ Location:Sec:28 Twp: 5N 63W Footage: 22 FNL  377 FWL
Bottom Hole Location:Sec:28 Twp: 5N 63W Footage: 436 FSL  352 FWL
Proposed Depth/Form:11636 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 743, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11636 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1826, Top: 0 ft., Bottom: 11636 ft.

Wellbore Completed
Completion Date:9/29/2018
Spud Date:9/4/2018Spud Date Is:ACTUAL
Measured TD:11737 ft.Measured PB depth:11678 ft.
True Vertical TD:6335 ft.True Vertical PB depth:6335 ft.
Top PZ Location:Sec:28 Twp: 5N 63WFootage: 22 FNL  377 FWL
Bottom Hole Location:Sec:28 Twp: 5N 63WFootage: 436 FSL  352 FWL
Log Types:CBL, Mud Log, LWD/MWD, (Resisitivity on 123-47012).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1609 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 0 ft., Bottom: 1619 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11727 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1767, Top: 370 ft., Bottom: 11737 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3460 ft.
SHARON SPRINGS6351 ft.
NIOBRARA6693 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2022                  Interval Top: 6920 ft.    Interval Bottom: 11636 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/21/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/23/2018Treatment End Date:12/4/2018
Treatment Summary:37-stage plug-and-perf completion; 200662 total bbls fluid pumped: 200197 bbls fresh water (slurry) and 465 bbls 15% HCl acid; 8750220 total lbs proppant pumped: 8395720 lbs 30/50 Ottawa Sand and 354500 lbs 100 mesh.
Total fluid used in treatment (bbls):200662Max pressure during treatment (psi):5280
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):465Min frac gradient (psi/ft):1.07
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7282
Fresh water used in treatment (bbls):200197Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8750220Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6344 ft.
Tubing Packer Depth:6344 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 129
BBLS_OIL 702
BTU_GAS 1
CALC_BBLS_H2O 129
CALC_BBLS_OIL 702
CALC_GOR 1053
CALC_MCF_GAS 739
CASING_PRESS 58
GRAVITY_OIL 44
MCF_GAS 739
TUBING_PRESS 1170
Perforation Data:
Interval Top:6920 ft.# Of Holes:888
Interval Bottom:11636 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2944
Total Gas Produced (MCF)73481
GOR24959
GOR DeterminationMCFE
Average BOE per Day42.794
Average MCFE per Day248.203

 Federal Financial Assurance  i 

 Tribal Well  i No