Drilling/Completion Operations | Form: (02 ) 401049191 6/27/2017 | Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling. |
Drilling/Completion Operations | Form: (02 ) 401049191 6/27/2017 | Operator acknowledges and will comply with COGCC policy for Bradenhead Monitoring during Hydraulic Fracturing treatments in the Greater Wattenberg Area dated May 29, 2012. |
Drilling/Completion Operations | Form: (02 ) 401049191 6/27/2017 | 317.p One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run. |
Planning | Form: (04 ) 403707727 4/10/2024 | Lights: Operator will conduct operations during daylight hours only. |
Community Outreach and Notification | Form: (04 ) 403707727 4/10/2024 | Prior to commencing operations, the Operator will provide an informational sheet to the owners/occupants of RBUs that within 2,000 feet and adjacent to the parcel on which the well is located. The sheet will include the Operator's contact information and the nature, timing, and expected duration of the operations. |
Wildlife | Form: (04 ) 403707727 4/10/2024 | Operations will only occur on the pad and will only be conducted during daylight hours. |
Dust control | Form: (04 ) 403707727 4/10/2024 | Dust suppression will be monitored and treated as necessary and will only consist of only freshwater unless otherwise requested and approved as applicable. Operator will limit speed to minimize fugitive dust emissions from vehicle traffic traveling on the access road. |
Noise mitigation | Form: (04 ) 403707727 4/10/2024 | Operator will comply with maximum permissible noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if necessary. |
Odor mitigation | Form: (04 ) 403707727 4/10/2024 | Nuisance odors are not anticipated for this Operation, however, will be monitored and treated, as necessary. Daily Operation summaries will document to ensure all BMP’s and COA’s are met. |