Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45033
Well Classification: OW Status: PR - 6/1/2025
Well Name/No:AD FED LIBRARY #20W-25-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2025
FacilityID:451238LocationID:451243
County:WELD #123Location:NWSW 21 5N65W 6
Field:WATTENBERG - #90750Elevation:4839 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1852FSL  367 FWLLat/Long: 40.382460 / -104.676490Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.382459 / -104.676486Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/13/2020
End Date: 4/19/2020
Reported: 5/5/2020
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2025             Measured TD: 19702 ft.    Vertical TD: 6935 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/26/2019
Proposed Top PZ Location:Sec:20 Twp: 5N 65W Footage: 244 FSL  505 FEL
Bottom Hole Location:Sec:24 Twp: 5N 66W Footage: 321 FSL  2152 FEL
Proposed Depth/Form:19846 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 19846 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1900, Top: 1500 ft., Bottom: 19846 ft.

Wellbore Completed
Completion Date:8/5/2019
Spud Date:4/25/2019Spud Date Is:ACTUAL
Measured TD:19702 ft.Measured PB depth:19681 ft.
True Vertical TD:6935 ft.True Vertical PB depth:6935 ft.
Top PZ Location:Sec:20 Twp: 5N 65WFootage: 244 FSL  505 FEL
Bottom Hole Location:Sec:24 Twp: 5N 66WFootage: 321 FSL  2152 FEL
Log Types:CBL, Mud, MWD/LWD, (Resistivity on 123-45937).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1603 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 0 ft., Bottom: 1603 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19692 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3160, Top: 1680 ft., Bottom: 19702 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3670 ft.NN
SUSSEX4398 ft.NN
SHANNON5247 ft.NN
SHARON SPRINGS7141 ft.NN
NIOBRARA7204 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/1/2025                  Interval Top: 7487 ft.    Interval Bottom: 19663 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/28/2020Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/13/2020Treatment End Date:4/19/2020
Treatment Summary:Frac'd Niobrara with 49-stage plug-and-perf; 167313 total bbls fluid pumped: 147283 bbls gelled fluid, 19880 bbls fresh water, and 150 bbls 28% HCl acid; 12179435 total lbs proppant pumped: 6125700 lbs 40/70 mesh and 6053735 lbs 30/50 mesh.
Total fluid used in treatment (bbls):167313Max pressure during treatment (psi):8671
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):150Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16066
Fresh water used in treatment (bbls):19880Disposition method For flowback:DISPOSAL
Total proppant used (lbs):12179435Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7457 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/5/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 46
BBLS_OIL 414
BTU_GAS 1297
CALC_BBLS_H2O 46
CALC_BBLS_OIL 414
CALC_GOR 6039
CALC_MCF_GAS 2500
CASING_PRESS 3346
GRAVITY_OIL 55
MCF_GAS 2500
TUBING_PRESS 3223
Perforation Data:
Interval Top:7487 ft.# Of Holes:1441
Interval Bottom:19663 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9498
Total Gas Produced (MCF)203529
GOR21428
GOR DeterminationMCFE
Average BOE per Day121.204
Average MCFE per Day702.991

 Federal Financial Assurance  i 

 Tribal Well  i No