WELL05-123-44918POT O&
39; GOLD
8-67-35-2C
DUNAMIS ENERGY OPERATING LLC
10848
PR
11/18/2020
DJ HORIZONTAL NBRR-FTHYS-CODL
16953
WELD  123
SWSE 26 8N67W 6
450827View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
401217953
05/05/2017
Operator agrees to comply with the DJ Basin Horizontal Offset Policy to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated well(s), referencing the API Number of the proposed horizontal well, to report that appropriate mitigation was completed prior to the hydraulic stimulation of the proposed horizontal well. Operator acknowledges the proximity of the following offset well(s) of concern: 05-123-11852, CARLETON 1 05-123-11988, JONES 1
EngineerForm: (02)
401217953
05/05/2017
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
EngineerForm: (02)
401217953
05/05/2017
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) All: Within 60 days of rig release, prior to stimulation. 2) Delayed completion: 6 months after rig release, prior to stimulation. 3) All: Within 30 days of first production, as reported on Form 5A.
EngineerForm: (04)
401581997
04/25/2019
1) Flaring of natural gas shall comply with COGCC Rule 912. 2) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 3) Report metered flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) The operator is required to obtain and maintain any required air permits from CDPHE. 5) The expectation for permanent flares controlling separators will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. 6) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
EngineerForm: (04)
401581997
04/25/2019
Gas analysis for well including H2S should be submitted via Form 43 and EDD by May 15, 2019.
EngineerForm: (04)
401581997
04/25/2019
This approval is good until July 31, 2019 and then the gas shall be immediately directed to a sales line or shut in and conserved.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (02 )
401217953
5/26/2017
Implement a Spill Prevention Control and Countermeasures (SPCC) to prevent and address any releases from bulk oil storage located onsite.
Dust controlForm: (02 )
401217953
5/26/2017
Operator shall employ practices for control of fugitive dust caused by their operations. Such practices shall include but are not limited to the use of speed restrictions, regular road maintenance, restriction of construction activity during high- wind days, and silica dust controls when handling sand used in hydraulic fracturing operations. Additional management practices such as road surfacing, wind breaks and barriers may be used.
Emissions mitigationForm: (02 )
401217953
5/26/2017
Associated Gas Flaring BMP – Following the last stage of separation associated gas will flow through a liquid knockout drum to remove entrained liquid phases. Following the liquid knockout drum, associated gas will flow to a smokeless combustion device capable of a 98% control efficiency. The combustion device will be equipped with a continuous pilot gas flame and an auto-ignitor. Enerplus will comply with all applicable Colorado – Air Pollution Control Division requirements to ensure adequate design and operation of the control device is maintained.
Odor mitigationForm: (02 )
401217953
5/26/2017
Oil & gas facilities and equipment shall be operated in such a manner that odors and dust do not constitute a nuisance or hazard to public welfare.
Drilling/Completion OperationsForm: (02 )
401217953
5/26/2017
One of the first wells drilled on the pad will be logged with openhole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached.The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which openhole logs were run.