Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-44918
Well Classification: OW Status: PR - 11/18/2020
Well Name/No:POT O' GOLD #8-67-35-2C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:DUNAMIS ENERGY OPERATING LLC - 10848
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/18/2020
FacilityID:450814LocationID:450827
County:WELD #123Location:SWSE 26 8N67W 6
Field:DJ HORIZONTAL NBRR-FTHYS-CODL - #16953Elevation:5187 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:299FSL  2181 FELLat/Long: 40.626117 / -104.858422Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.626117 / -104.858425Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/19/2018
End Date: 6/30/2018
Reported: 8/8/2018
Days to report: 39
Disclosure: Sidetrack #00
Start Date: 6/30/2018
End Date: 7/14/2018
Reported: 12/9/2019
Days to report: 513
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/18/2020             Measured TD: 17645 ft.    Vertical TD: 7255 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/18/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/25/2019
Proposed Top PZ Location:Sec:35 Twp: 8N 67W Footage: 659 FNL  650 FWL
Bottom Hole Location:Sec:2 Twp: 7N 67W Footage: 650 FSL  650 FWL
Proposed Depth/Form:17676 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 535-773 , Unit Acreage: 1280, Drill Unit: Sec 35 & Sec 2: All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 92 , Citings Type: PLANNED
Cement:Sacks: 179, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 304, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17676 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2845, Top: 0 ft., Bottom: 17676 ft.

Wellbore Completed
Completion Date:4/22/2018
Spud Date:3/28/2018Spud Date Is:ACTUAL
Measured TD:17645 ft.Measured PB depth:17614 ft.
True Vertical TD:7255 ft.True Vertical PB depth:7255 ft.
Top PZ Location:Sec:35 Twp: 8N 67WFootage: 730 FNL  602 FWL
Bottom Hole Location:Sec:2 Twp: 7N 67WFootage: 638 FSL  647 FWL
Log Types:MWD/LWD, CBL, Mud Log, (RES in API - 05-123-44921)
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 103 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 62, Top: 0 ft., Bottom: 103 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1620 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 556, Top: 0 ft., Bottom: 1620 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17633 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2436, Top: 1535 ft., Bottom: 17645 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RICHARD3736 ft.NN
SUSSEX4390 ft.NN
HYGIENE5057 ft.NN
SHARON SPRINGS7488 ft.NN
NIOBRARA7540 ft.NN
FORT HAYS8093 ft.NN
CODELL8392 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/18/2020                Interval Top: 13641 ft.    Interval Bottom: 13970 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/7/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/30/2018Treatment End Date:7/14/2018
Treatment Summary:Completed Interval: 13,641' - 13,970'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:13641 ft.# Of Holes:70
Interval Bottom:13970 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  PR - 11/18/2020                Interval Top: 8400 ft.    Interval Bottom: 17597 ft.

 Completed Information for Formation CODELL
1st Production Date:8/7/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/30/2018Treatment End Date:7/14/2018
Treatment Summary:Completed Interval : 8,400' - 11,483'; 11,670' - 11,971'; 12,063' - 13,358'; 14,004' - 15,662'; 15,919' - 16,068' - 16,207' - 17,597'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8400 ft.# Of Holes:1360
Interval Bottom:17597 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  PR - 11/18/2020                Interval Top: 8288 ft.    Interval Bottom: 16193 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:8/7/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/30/2018Treatment End Date:7/14/2018
Treatment Summary:Completed Interval: 8,288' - 8,386'; 11,500' - 11,650'; 11,985' - 12,050'; 13,375' - 13,628'; 15,697' - 15,886'; 16,085' - 16,193'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8288 ft.# Of Holes:970
Interval Bottom:16193 ft.Hole Size:0.42 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  CM - 8/6/2018                  Interval Top: 8288 ft.    Interval Bottom: 17597 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:8/7/2018Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/30/2018Treatment End Date:7/14/2018
Treatment Summary:40 stages, 6,584,280 lbs 100Mesh white sand, 11,219,860 lbs 30/50 mesh regional sand, 2,152,320 lbs 30/50 white sand, 406,598 bbls Slickwater, 19,800 gal 15% concentration HCL acid.
Total fluid used in treatment (bbls):407069Max pressure during treatment (psi):8125
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):471Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):31440
Fresh water used in treatment (bbls):406598Disposition method For flowback:DISPOSAL
Total proppant used (lbs):19956460Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:7824 ft.
Tubing Packer Depth:7811 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/6/2018Test Method:Flowback
Hours Tested:24Gas Type:DRY
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 1090
BBLS_OIL 169
BTU_GAS 1486
CALC_BBLS_H2O 1090
CALC_BBLS_OIL 169
CALC_GOR 663
CALC_MCF_GAS 112
GRAVITY_OIL 40
MCF_GAS 112
TUBING_PRESS 800
Perforation Data:
Interval Top:8288 ft.# Of Holes:1601
Interval Bottom:17597 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)8692
Total Gas Produced (MCF)13695
GOR1575
GOR DeterminationBOE
Average BOE per Day30.454
Average MCFE per Day176.637

 Federal Financial Assurance  i 

 Tribal Well  i No