| Planning | Form: (02 ) 400562499 9/20/2014 | 604c.(2).E. Multiwell Pads: This 2A application is for a 4-well pad. No suitable existing locations are in the area. Location was chosen by surface owner, Dennis Klein is also in agreement with these locations as they will allow him to install a center pivot for irrigation. Dennis Klein also owns BU 200 feet to the north, is in agreement with location of facility.
|
| Planning | Form: (02 ) 400562499 9/20/2014 | 604c.(2).V. Development From Existing Well Pads: An existing pad was not available to utilize to develop these wells.
|
| Planning | Form: (02 ) 400562499 9/20/2014 | 604.c.(2).W. Site Specific Measures: Lights should be turned downward and away from building units within the 1,000 foot buffer area. Dust mitigation will be provided as necessary. County road used for access has low traffic volume.
|
| Planning | Form: (02 ) 400562499 9/20/2014 | 604c.(2).I. BOPE Testing for Drilling Operations: PDC's contractors will supply a double ram BOPE (Blinds and pipes) and always function test BOPE’s prior to placement on the well head and inspect and replace all seals and ram block rubbers. After installation of the BOPE, PDCE conducts a pressure test on the BOPE at a low pressure of (200-400 psi) and a high pressure test with a third party tester, all tests are digitally recorded.
|
| Planning | Form: (02 ) 400562499 9/20/2014 | 604c.(2).J. BOPE for Well Servicing Operations: All valves will also be tested to maximum rating by a third party prior to being delivered to location. Whenever snubbing operations are being used the snubbing stack will be pressure tested at the same time the BOPE is being tested which consist of a single pipe ram and a annular bag.
|
| Planning | Form: (02 ) 400562499 9/20/2014 | 604c.(2).L. Drill Stem Tests: PDC does not conduct drill stem tests, but will seek prior approval from the director if a drill stem test will be preformed.
|
| Planning | Form: (02 ) 400562499 9/20/2014 | 604c.(2).U. Identification of Plugged and Abandoned Wells: Pursuant to rule 319.a.(5)., once the well has been plugged and abandoned, PDC will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging.
|
| Traffic control | Form: (02 ) 400562499 9/20/2014 | 604c.(2).D. Traffic Plan: If required by the local government, a traffic plan will be coordinated with the local jurisdiction prior to commencement of operations.
|
| General Housekeeping | Form: (02 ) 400562499 9/20/2014 | 604c.(2).N. Control of Fire Hazards: PDC will ensure that any material that might be deemed a fire hazard will be will remain no less than twenty-five (25) feet from the wellhead(s), tanks and separator(s). PDC installs automation equipment for tank level and pressure monitoring inside the bermed area that complies with API RP 500 classifications and with the current national electrical code as adopted by the State of Colorado.
|
| General Housekeeping | Form: (02 ) 400562499 9/20/2014 | 604c.(2).P. Removal of Surface Trash: A commercial size trash bin for removing debris will be located on site. This bin will be for use by all parties affiliated with the operation.
|
| General Housekeeping | Form: (02 ) 400562499 9/20/2014 | 604c.(2).T. Well Site Cleared: The wellsite will be cleared of all non-essential equipment within ninety (90) days after all wells associated with the pad have been plugged and abandoned.
|
| Construction | Form: (02 ) 400562499 9/20/2014 | 604c.(2).G. Berm Construction: A geosynthetic liner will be laid under the tanks on this location and a metal containment will be constructed. Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to protect the down gradient water sources located as follows from the nearest well head : ditch 246 feet north-west.
|
| Construction | Form: (02 ) 400562499 9/20/2014 | 604c.(2).S. Access Roads: PDC will utilize the lease access road off of WCR 51 for drilling operations and maintenance equipment. The lease access road will be properly constructed and maintained to accommodate for local emergency vehicle access.
|
| Construction | Form: (02 ) 400562499 9/20/2014 | 604c.(2).M. Fencing Requirements: The completed wellsites will be surrounded with a fence and gate. PDC personnel will monitor the wellsites regularly upon completion of the wells. Authorized representatives and/or PDC personnel shall be on-site during drilling and completion operations.
|
| Construction | Form: (02 ) 400562499 9/20/2014 | 604c.(2).Q. Guy Line Anchors: Rig guy wires are anchored to the rig’s base beam that the rig stands on, temporary and permanent anchors will not be set on this location.
|
| Construction | Form: (02 ) 400562499 9/20/2014 | 604c.(2).R. Tank Specifications: Condensate storage tanks will be designed, constructed and maintained in accordance with National Fire Protection Association (NFPA) Code 30 (2008 version). PDC will maintain written records to verify proper design, construction and maintenance. All records will be available for inspection by the Director.
|
| Noise mitigation | Form: (02 ) 400562499 9/20/2014 | 604c.(2).A. Noise: WELL PAD: PDC has conducted baseline noise surveys for all drilling rigs that are being contracted and has also conducted a baseline noise survey for hydraulic fracture stimulation operations on a representative horizontal well. A review was conducted to identify potential receptors within 1000 feet of the proposed Klein 19MN-HZ Pad site. There are two building units of concern. The three building units are located as follows: NW of the proposed pad at a distance of approximately 200 feet, and NW of the proposed pad at a distance of approximantely 608 feet. Based on the receptors locations, projected noise levels are anticipated to exceed the Light Industrial Zone standard of 65 decibels (db) at the receptor location. Therefore, noise mitigation will be necessary for the Klein 19MN-HZ pad. A sound wall will be installed to the north of the proposed location prior to drilling and completion activities, methods of noise mitigation shall include but not be limited to hay bales, noise walls, or customized semi-trailers. PRODUCTION FACILITIES: It is not anticipated that noise mitigation will be necessary at the proposed tank battery location. After construction is completed, equipment installed and production begins, noise levels will be assessed to determine if mitigation measures will be required to be compliant with Rule 802.
|
| Drilling/Completion Operations | Form: (02 ) 400562499 9/20/2014 | 604c.(2).O. Loadlines: All loadlines shall be bullplugged or capped.
|
| Drilling/Completion Operations | Form: (04 ) 400954148 2/22/2016 | One of the first wells drilled on the pad will be logged with Cased hole Pulsed Neutron Log with Gamma Ray Log from TD into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run in that well and have those logs attached. The Form 5 for each well shall clearly state “No open-hole logs were run” and shall reference the Rule 317.p Exception granted for the well. |
| Planning | Form: (02 ) 401026299 5/4/2016 | 604c.(2).E. Multiwell Pads: This 2A application is for a 4-well pad. No suitable existing
locations are in the area. Location was chosen by surface owner, Dennis Klein is also
in agreement with these locations as they will allow him to install a center pivot for
irrigation. Dennis Klein also owns BU 200 feet to the north, is in agreement with
location of facility. |
| Planning | Form: (02 ) 401026299 5/4/2016 | 604c.(2).V. Development From Existing Well Pads: An existing pad was not available
to utilize to develop these wells. |
| Planning | Form: (02 ) 401026299 5/4/2016 | 604.c.(2).W. Site Specific Measures: Lights should be turned downward and away
from building units within the 1,000 foot buffer area. Dust mitigation will be provided
as necessary. County road used for access has low traffic volume. |
| Planning | Form: (02 ) 401026299 5/4/2016 | 604c.(2).U. Identification of Plugged and Abandoned Wells: Pursuant to rule 319.a.
(5)., once the well has been plugged and abandoned, PDC will identify the location of
the wellbore with a permanent monument that will detail the well name and date of
plugging. |
| Traffic control | Form: (02 ) 401026299 5/4/2016 | 604c.(2).D. Traffic Plan: If required by the local government, a traffic plan will be
coordinated with the local jurisdiction prior to commencement of operations. |
| General Housekeeping | Form: (02 ) 401026299 5/4/2016 | 604c.(2).N. Control of Fire Hazards: PDC will ensure that any material that might be
deemed a fire hazard will be will remain no less than twenty-five (25) feet from the
wellhead(s), tanks and separator(s). PDC installs automation equipment for tank level
and pressure monitoring inside the bermed area that complies with API RP 500
classifications and with the current national electrical code as adopted by the State of
Colorado. |