Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-40248
Well Classification: OW Status: PR - 1/2/2026
Well Name/No:Klein #19M-402
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/2/2026
FacilityID:438987LocationID:438989
County:WELD #123Location:NWNE 19 5N64W 6
Field:WATTENBERG - #90750Elevation:4628 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:688FNL  2432 FELLat/Long: 40.389990 / -104.592080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.389990 / -104.592080Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/15/2017
End Date: 3/3/2017
Reported: 4/12/2017
Days to report: 40
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/2/2026             Measured TD: 17440 ft.    Vertical TD: 6809 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/2/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/3/2018
Proposed Top PZ Location:Sec:19 Twp: 5N 64W Footage: 26 FNL  1826 FEL
Bottom Hole Location:Sec:21 Twp: 5N 64W Footage: 105 FNL  2306 FEL
Proposed Depth/Form:17445 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1425 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1425 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17445 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 17445 ft.

Wellbore Completed
Completion Date:12/10/2016
Spud Date:11/22/2016Spud Date Is:ACTUAL
Measured TD:17440 ft.Measured PB depth:17419 ft.
True Vertical TD:6809 ft.True Vertical PB depth:6809 ft.
Top PZ Location:Sec:19 Twp: 5N 64WFootage: 29 FNL  1920 FEL
Bottom Hole Location:Sec:21 Twp: 5N 64WFootage: 79 FNL  2966 FWL
Log Types:CBL, MWD, Cased hole neutron (DIL in 123-20129)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1462 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 0 ft., Bottom: 1462 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17433 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2130, Top: 710 ft., Bottom: 17433 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3677 ft.
SUSSEX4264 ft.
SHANNON4953 ft.
SHARON SPRINGS6511 ft.
NIOBRARA6679 ft.
FORT HAYS7233 ft.
CODELL7345 ft.
CARLILE7533 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 1/2/2026                  Interval Top: 7555 ft.    Interval Bottom: 17371 ft.

 Completed Information for Formation CARLILE
1st Production Date:3/18/2017Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:Completed Depths: 7507-7848, 9726-9866, 13251-13372
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:7555 ft.# Of Holes:2688
Interval Bottom:17371 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/2/2026                  Interval Top: 7367 ft.    Interval Bottom: 7533 ft.

 Completed Information for Formation CODELL
1st Production Date:3/8/2017Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:Completed Depths: 7348-7507, 7848-9726, 9866-10123, 10442-13251, 13372-13656, 13666-17322
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7367 ft.# Of Holes:84
Interval Bottom:7533 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 1/2/2026                  Interval Top: 7273 ft.    Interval Bottom: 17371 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/8/2017Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/15/2017Treatment End Date:3/3/2017
Treatment Summary:72 Stage Plug and Perf, Perf'd from 7273-17207, 1 Toe Sleeve from 17318-17322 Total Fluid: 253,766 bbls Gel Fluid: 171,215 bbls Slickwater Fluid: 80,309 bbls 15% HCl Acid: 2,242 bbls Total Proppant: 11,674,430 lbs Silica Proppant: 11,674,430 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):253766Max pressure during treatment (psi):5557
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:72
Total acid used in treatment (bbls):2242Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10043
Fresh water used in treatment (bbls):251524Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11674430Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 612
BBLS_OIL 308
BTU_GAS 1351
CALC_BBLS_H2O 612
CALC_BBLS_OIL 308
CALC_GOR 1785
CALC_MCF_GAS 550
CASING_PRESS 2614
GRAVITY_OIL 50
MCF_GAS 550
TUBING_PRESS 1543
Perforation Data:
Interval Top:7273 ft.# Of Holes:2796
Interval Bottom:17371 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/2/2026                  Interval Top: 7273 ft.    Interval Bottom: 7322 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/8/2017Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/14/2017Treatment End Date:N/A
Treatment Summary:Completed Depths: 7273-7348, 10123-10442, 13656-13666
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7273 ft.# Of Holes:24
Interval Bottom:7322 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2290
Total Gas Produced (MCF)14368
GOR6274
GOR DeterminationBOE
Average BOE per Day13.182
Average MCFE per Day76.440

 Federal Financial Assurance  i 

 Tribal Well  i No