Engineer | Form: (02 ) 400550111 5/1/2014 | Operator acknowledges the proximity of the listed wells: Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
COLLINS 1-1 ( API NO 123-13363),FARR 1 ( API NO 123-11714),
VICTOR C 19-13 ( API NO 123-13508),VICTOR C 19-12 ( API NO 123-13761),
FREEDOM ONE C 19-5 ( API NO 123-14300),FREEDOM TWO C 19-4 ( API NO 123-14624),
STEWART 30-1 ( API NO 123-11797),JOHNSON A-30 ( API NO 123-11961),
STEWART 30-2 ( API NO 123-13302),BROSNAHAN 13-30 ( API NO 123-18990),
OCOMA UPRR C31-13 ( API NO 123-13400),OCOMO C 31-14 ( API NO 123-13401),
OCOMA-UPRR C 31-11 ( API NO 123-13404),OCOMA-UPRR C31-12 ( API NO 123-13405),
HUNTSMAN G 13-16 ( API NO 123-14665),MILLER 24-1 ( API NO 123-14440),
BURKE 24-3 ( API NO 123-14522),API 24-1 ( API NO 123-14684),
CPC PLUSS 25-1 ( API NO 123-12573),PLUSS G 25-8 ( API NO 123-13149),
OCOMA G25-8 ( API NO 123-13149),OCOMA G 25-9 ( API NO 123-13355),
OCOMA G 25-16 ( API NO 123-13356),OCOMA G25-23 ( API NO 123-15626),
GERRITY STATE G 36-01 ( API NO 123-13291),GERRITY STATE G 36-9 ( API NO 123-13292),
GERRITY STATE G 36-08 ( API NO 123-13313),STATE G 36-16 ( API NO 123-13314)
|
Engineer | Form: (02 ) 400550111 5/1/2014 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from the bottom of the production casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Permit | Form: (02 ) 400550111 5/8/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
|
Permit | Form: (02 ) 400550111 6/6/2014 | Operator must comply with COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. |