|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2023 Measured TD: 11987 ft. Vertical TD: 6895 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/5/2016 | Proposed Top PZ Location: | Sec:31 Twp: 4N 64W | Footage: 550 FNL 804 FWL | Bottom Hole Location: | Sec:31 Twp: 4N 64W | Footage: 75 FSL 808 FWL | Proposed Depth/Form: | 11992 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 372, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 650 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 310, Top: 0 ft., Bottom: 650 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7341 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 0 ft., Bottom: 7341 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7191 ft., Depth: 11992 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 9/26/2014 | Spud Date: | 9/19/2014 | Spud Date Is: | ACTUAL | Measured TD: | 11987 ft. | Measured PB depth: | 11987 ft. | True Vertical TD: | 6895 ft. | True Vertical PB depth: | 6895 ft. | Top PZ Location: | Sec:31 Twp: 4N 64W | Footage: 676 FNL 792 FWL | Bottom Hole Location: | Sec:31 Twp: 4N 64W | Footage: 76 S 792 W | Log Types: | CBL, MUD, GR/MWD | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 94 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 94 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 666 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 360, Top: 0 ft., Bottom: 666 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7347 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 639, Top: 230 ft., Bottom: 7347 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7243 ft., Depth: 11977 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 1091 ft. | | | | PARKMAN | 3857 ft. | | | | SUSSEX | 4238 ft. | | | | SHANNON | 5093 ft. | | | | TEEPEE BUTTES | 6193 ft. | | | | NIOBRARA | 7053 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2023 Interval Top: 7473 ft. Interval Bottom: 11899 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/12/2014 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/24/2014 | Treatment End Date: | 11/28/2014 | Treatment Summary: | FRAC'D W/4136076 GALS BROADBAND PILL, YF 130HT, WF 100 AND SLICK WATER AND 4636003# OTTAWA SAND | Total fluid used in treatment (bbls): | 98478 | Max pressure during treatment (psi): | 6506 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 24 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.96 | Recycled water used in treatment (bbls): | 4999 | Total flowback volume recovered (bbls): | 2026 | Fresh water used in treatment (bbls): | 93478 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 4636003 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7243 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/26/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 400 | BBLS_OIL | 201 | BTU_GAS | 1302 | CALC_BBLS_H2O | 400 | CALC_BBLS_OIL | 201 | CALC_GOR | 4258 | CALC_MCF_GAS | 856 | CASING_PRESS | 2340 | GRAVITY_OIL | 40 | MCF_GAS | 856 | TUBING_PRESS | 1540 |
| Perforation Data: | Interval Top: | 7473 ft. | # Of Holes: | | Interval Bottom: | 11899 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1228 |
Total Gas Produced (MCF) | 25832 |
GOR | 21035 |
GOR Determination | MCFE |
Average BOE per Day | 15.530 |
Average MCFE per Day | 90.104 |
Federal Financial Assurance | i | |
|
|