| Engineer | Form: (02) 400436210 08/08/2013 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with
cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. Ensure that
the wellbore complies with setback requirements in commission orders or rules prior to
producing the well. |
| Permit | Form: (02) 400436210 09/26/2013 | Operator must meet water well testing requirements per Rule 318A.
|