Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-38273
Well Classification: OW Status: SI - 1/1/2026
Well Name/No:Guttersen #6M-303
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:434589LocationID:434585
County:WELD #123Location:NWNE 6 2N63W 6
Field:WATTENBERG - #90750Elevation:4823 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:75FNL  2194 FELLat/Long: 40.174460 / -104.478770Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.174458 / -104.478790Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/23/2014
End Date: 11/24/2014
Reported: 12/10/2014
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2026             Measured TD: 11106 ft.    Vertical TD: 6671 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/7/2015
Proposed Top PZ Location:Sec:6 Twp: 2N 63W Footage: 826 FNL  2475 FEL
Bottom Hole Location:Sec:6 Twp: 2N 63W Footage: 500 FSL  2468 FEL
Proposed Depth/Form:11080 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7164 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7164 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5958 ft., Depth: 11130 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/6/2014
Spud Date:6/27/2014Spud Date Is:ACTUAL
Measured TD:11106 ft.Measured PB depth:11098 ft.
True Vertical TD:6671 ft.True Vertical PB depth:6671 ft.
Top PZ Location:Sec:6 Twp: 2N 63WFootage: 933 FNL  2476 FEL
Bottom Hole Location:Sec:6 Twp: 2N 63WFootage: 500 FSL  2474 FEL
Log Types:CBL, MWD
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 888 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 888 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7154 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 622, Top: 770 ft., Bottom: 7154 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7013 ft., Depth: 11102 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3690 ft.
SUSSEX4087 ft.
SHARON SPRINGS6318 ft.
NIOBRARA6566 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 1/1/2026                  Interval Top: 7219 ft.    Interval Bottom: 11106 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/10/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/23/2014Treatment End Date:11/24/2014
Treatment Summary:16 Stage Sliding Sleeve, Swell Packer set at 7,219' Total Fluid: 74,478 bbls Gel Fluid: 60,382 bbls Slickwater Fluid: 14,096 bbls Total Proppant: 4,288,816 lbs Silica Proppant: 4,288,816 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):74478Max pressure during treatment (psi):5119
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):Min frac gradient (psi/ft):1.08
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):6060
Fresh water used in treatment (bbls):74478Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4288816Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 141
BBLS_OIL 277
BTU_GAS 1312
CALC_BBLS_H2O 141
CALC_BBLS_OIL 277
CALC_GOR 657
CALC_MCF_GAS 182
CASING_PRESS 814
GRAVITY_OIL 42
MCF_GAS 182
TUBING_PRESS 433
Perforation Data:
Interval Top:7219 ft.# Of Holes:0
Interval Bottom:11106 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
03/25/2025
Defined Inactive (SI)YLast Production
01/19/2025
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No